X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111216020

Well Details

Well ID: 0485111216020
Loading map...
Location: 02/16-12-048-11W5/0
Location Alias: 02/16-12-48-11 W5M
Location Alias 2: 02/16-12-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 12
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 16-12-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0434120
License Date: 2011-06-07
License Status: Issued
Spud Date: 2011-08-28
Final Drill Date: 2011-09-08
Well Total Depth: 3405.00 m
Surface Hole Latitude: 53.130106
Surface Hole Longitude: -115.490245

For data sources see[1][2]

Well History

Date Event
2011-06-07 Obtained License
2011-08-28 Well Log Performed
2011-08-30 Surface Casing Operation Performed
2011-08-31 Direction Drilling Operation Performed - Horizontal
2011-09-08 Finished Drilling
2011-09-08 Well Log Performed
2011-09-08 Well Mode changed to Drilled and Cased
2011-09-11 Perforation Treatment Performed - Open-Hole Completion
2011-09-11 Production Casing Operation Performed
2011-09-11 Rig Released
2011-09-23 Well Log Performed
2011-10-08 Well Log Performed
2011-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-16 Well Began Production
2011-10-16 Well Fluid changed to Crude Oil
2011-10-16 Well Mode changed to Flowing
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-31 1404.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-11 Open Hole/Barefoot Completion 3401.00 3405.00 0
2011-10-15 Multi-Stage Fracture 2824.10 2824.20 0
2011-10-15 Multi-Stage Fracture 2747.50 2747.60 0
2011-10-15 Multi-Stage Fracture 2685.20 2685.30 0
2011-10-15 Multi-Stage Fracture 2609.70 2609.80 0
2011-10-15 Multi-Stage Fracture 2546.90 2547.00 0
2011-10-15 Multi-Stage Fracture 2470.30 2470.40 0
2011-10-15 Multi-Stage Fracture 2408.20 2408.30 0
2011-10-16 Multi-Stage Fracture 2331.40 2331.50 0
2011-10-16 Multi-Stage Fracture 2269.40 2269.50 0
2011-10-16 Multi-Stage Fracture 2191.60 2191.70 0
2011-10-14 Multi-Stage Fracture 3376.10 3376.20 0
2011-10-16 Multi-Stage Fracture 2130.00 2130.10 0
2011-10-16 Multi-Stage Fracture 2053.20 2053.30 0
2011-10-14 Multi-Stage Fracture 3310.00 3310.10 0
2011-10-14 Multi-Stage Fracture 3236.40 3236.50 0
2011-10-15 Multi-Stage Fracture 3160.00 3160.10 0
2011-10-15 Multi-Stage Fracture 3098.10 3098.20 0
2011-10-15 Multi-Stage Fracture 3035.30 3035.40 0
2011-10-15 Multi-Stage Fracture 2959.40 2959.50 0
2011-10-15 Multi-Stage Fracture 2886.70 2886.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1190 0.0 0.0 0.0
2012 8420 0.0 0.0 0.0
2013 8544 0.0 0.0 0.0
2014 8547 0.0 0.0 0.0
2015 8500 0.0 0.0 0.0
2016 8533 0.0 0.0 0.0
2017 8334 0.0 0.0 0.0
2018 8353 0.0 0.0 0.0
2019 8558 0.0 0.0 0.0
2020 1892 0.0 0.0 0.0

For data sources see[6]

References