If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485111409020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.139278,"lon":-115.516883,"icon":""}]} |
| Location: 02/09-14-048-11W5/0 | |
| Location Alias: 02/09-14-48-11 W5M | |
| Location Alias 2: 02/09-14-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 14 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ 102 PEMBINA 9-14-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0491654 | |
| License Date: 2018-10-29 | |
| License Status: Amended | |
| Spud Date: 2019-10-31 | |
| Final Drill Date: 2019-11-07 | |
| Well Total Depth: 3664.00 m | |
| Surface Hole Latitude: 53.139278 | |
| Surface Hole Longitude: -115.516883 |
| Date | Event |
|---|---|
| 2018-10-29 | Obtained License |
| 2019-10-31 | Drill To LD |
| 2019-11-01 | Surface Casing Operation Performed |
| 2019-11-02 | Direction Drilling Operation Performed - Deviate |
| 2019-11-04 | Direction Drilling Operation Performed - Horizontal |
| 2019-11-07 | Finished Drilling |
| 2019-11-07 | Well Log Performed |
| 2019-11-07 | Well Mode changed to Drilled and Cased |
| 2019-11-08 | Production Casing Operation Performed |
| 2019-11-08 | Rig Released |
| 2020-01-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-01-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2020-02-22 | Well Began Production |
| 2020-02-22 | Well Fluid changed to Crude Oil |
| 2020-02-22 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-10-31 | Horizon Drilling Inc. | 39 | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-11-02 | 1500.80 | Deviate (5 - 79 degrees) |
| 2019-11-04 | 2001.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2020-01-24 | Multi-Stage Fracture | 3626.90 | 3627.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3222.80 | 3222.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3180.90 | 3181.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3152.90 | 3153.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3111.60 | 3111.70 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3069.80 | 3069.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3027.90 | 3028.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2987.20 | 2987.30 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2945.70 | 2945.80 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2903.60 | 2903.70 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2862.10 | 2862.20 | 0 |
| 2020-01-24 | Multi-Stage Fracture | 3585.00 | 3585.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2834.30 | 2834.40 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2793.60 | 2793.70 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2751.90 | 2752.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2710.10 | 2710.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2668.40 | 2668.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2626.60 | 2626.70 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2584.80 | 2584.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2542.90 | 2543.00 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2501.80 | 2501.90 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2474.00 | 2474.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3543.00 | 3543.10 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2432.40 | 2432.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2390.40 | 2390.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2348.50 | 2348.60 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2307.10 | 2307.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2265.70 | 2265.80 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 2224.70 | 2224.80 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 2196.50 | 2196.60 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 2154.50 | 2154.60 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 2113.10 | 2113.20 | 0 |
| 2020-01-26 | Multi-Stage Fracture | 2071.20 | 2071.30 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3501.10 | 3501.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3473.10 | 3473.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3389.40 | 3389.50 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3348.10 | 3348.20 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3306.50 | 3306.60 | 0 |
| 2020-01-25 | Multi-Stage Fracture | 3264.70 | 3264.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-01-24 | 2020-01-26 | 1,829 | 5,712 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 94.9355 | N/A | |||
| 40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.0644 | N/A | ||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0093 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0093 | N/A | ||||
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0847 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0847 | N/A | ||||
| Nitrogen | Element | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.6837 | N/A | |
| ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.103 | N/A | |
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.103 | N/A | ||||
| ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0847 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0847 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0847 | N/A |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 935 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-11-08 | No Incident Encountered | 0.00 | 0.00 |
| 2020-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]