X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111416020

Well Details

Well ID: 0485111416020
Loading map...
Location: 02/16-14-048-11W5/0
Location Alias: 02/16-14-48-11 W5M
Location Alias 2: 02/16-14-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 14
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 16-14-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0418120
License Date: 2010-01-29
License Status: Issued
Spud Date: 2010-02-06
Final Drill Date: 2010-02-24
Well Total Depth: 3088.00 m
Surface Hole Latitude: 53.147746
Surface Hole Longitude: -115.511980

For data sources see[1][2]

Well History

Date Event
2010-01-29 Obtained License
2010-02-09 Surface Casing Operation Performed
2010-02-12 Direction Drilling Operation Performed - Horizontal
2010-02-16 Intermediate Casing Operation Performed
2010-02-24 Finished Drilling
2010-02-24 Perforation Treatment Performed - Open-Hole Completion
2010-02-24 Well Log Performed
2010-02-24 Well Mode changed to Drilled and Cased
2010-02-25 Production Casing Operation Performed
2010-02-26 Rig Released
2010-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-09 Well Began Production
2010-04-09 Well Fluid changed to Crude Oil
2010-04-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-12 1503.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-24 Open Hole/Barefoot Completion 3086.60 3088.00 0
2010-03-10 Multi-Stage Fracture 2357.20 2357.30 0
2010-03-10 Multi-Stage Fracture 2273.10 2273.20 0
2010-03-10 Multi-Stage Fracture 2194.60 2194.70 0
2010-03-10 Multi-Stage Fracture 2110.10 2110.20 0
2010-03-09 Multi-Stage Fracture 3020.80 3020.90 0
2010-03-09 Multi-Stage Fracture 2936.70 2936.80 0
2010-03-09 Multi-Stage Fracture 2853.50 2853.60 0
2010-03-09 Multi-Stage Fracture 2770.00 2770.10 0
2010-03-09 Multi-Stage Fracture 2698.70 2698.80 0
2010-03-09 Multi-Stage Fracture 2612.90 2613.00 0
2010-03-09 Multi-Stage Fracture 2525.00 2525.10 0
2010-03-10 Multi-Stage Fracture 2440.60 2440.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5022 0.0 0.0 0.0
2011 8030 0.0 0.0 0.0
2012 7817 0.0 0.0 0.0
2013 8536 0.0 0.0 0.0
2014 8289 0.0 0.0 0.0
2015 6397 0.0 0.0 0.0
2016 8681 0.0 0.0 0.0
2017 8382 0.0 0.0 0.0
2018 6899 0.0 0.0 0.0
2019 7590 0.0 0.0 0.0
2020 2043 0.0 0.0 0.0

For data sources see[6]

References