X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112008000

Well Details

Well ID: 0485112008000
Loading map...
Location: 00/08-20-048-11W5/0
Location Alias: 00/08-20-48-11 W5M
Location Alias 2: 00/08-20-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 20
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 8-20-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0433121
License Date: 2011-04-21
License Status: Issued
Spud Date: 2011-07-27
Final Drill Date: 2011-08-09
Well Total Depth: 3534.00 m
Surface Hole Latitude: 53.152258
Surface Hole Longitude: -115.589390

For data sources see[1][2]

Well History

Date Event
2011-04-21 Obtained License
2011-07-28 Surface Casing Operation Performed
2011-07-30 Direction Drilling Operation Performed - Horizontal
2011-08-09 Finished Drilling
2011-08-09 Well Log Performed
2011-08-09 Well Mode changed to Drilled and Cased
2011-08-12 Perforation Treatment Performed - Open-Hole Completion
2011-08-12 Production Casing Operation Performed
2011-08-13 Rig Released
2011-08-23 Well Log Performed
2011-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-17 Well Began Production
2011-10-17 Well Fluid changed to Crude Oil
2011-10-17 Well Mode changed to Flowing
2014-07-01 Well Fluid changed to Crude Oil
2014-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-30 1561.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-12 Open Hole/Barefoot Completion 3530.00 3534.00 0
2011-09-13 Multi-Stage Fracture 3133.70 3133.80 0
2011-09-14 Multi-Stage Fracture 3086.10 3086.20 0
2011-09-14 Multi-Stage Fracture 3037.00 3037.10 0
2011-09-14 Multi-Stage Fracture 2987.50 2987.60 0
2011-09-14 Multi-Stage Fracture 2952.70 2952.80 0
2011-09-20 Multi-Stage Fracture 2903.90 2904.00 0
2011-09-20 Multi-Stage Fracture 2855.10 2855.20 0
2011-09-20 Multi-Stage Fracture 2806.30 2806.40 0
2011-09-21 Multi-Stage Fracture 2771.60 2771.70 0
2011-09-21 Multi-Stage Fracture 2722.30 2722.40 0
2011-09-10 Multi-Stage Fracture 3504.40 3504.50 0
2011-09-21 Multi-Stage Fracture 2672.80 2672.90 0
2011-09-21 Multi-Stage Fracture 2622.80 2622.90 0
2011-09-21 Multi-Stage Fracture 2575.90 2576.00 0
2011-09-22 Multi-Stage Fracture 2540.20 2540.30 0
2011-09-10 Multi-Stage Fracture 3450.30 3450.40 0
2011-09-12 Multi-Stage Fracture 3402.90 3403.00 0
2011-09-12 Multi-Stage Fracture 3355.80 3355.90 0
2011-09-13 Multi-Stage Fracture 3308.70 3308.80 0
2011-09-13 Multi-Stage Fracture 3262.00 3262.10 0
2011-09-13 Multi-Stage Fracture 3214.60 3214.70 0
2011-09-13 Multi-Stage Fracture 3167.20 3167.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1780 0.0 0.0 0.0
2012 8528 0.0 0.0 0.0
2013 8628 0.0 0.0 0.0
2014 8246 0.0 0.0 0.0
2015 7102 0.0 0.0 0.0
2016 8612 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 6259 0.0 0.0 0.0
2019 8418 0.0 0.0 0.0
2020 2023 0.0 0.0 0.0

For data sources see[6]

References