X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112102000

Well Details

Well ID: 0485112102000
Loading map...
Location: 00/02-21-048-11W5/0
Location Alias: 00/02-21-48-11 W5M
Location Alias 2: 00/02-21-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 21
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 2-21-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0423198
License Date: 2010-09-02
License Status: Issued
Spud Date: 2010-09-28
Final Drill Date: 2010-10-11
Well Total Depth: 3554.00 m
Surface Hole Latitude: 53.166163
Surface Hole Longitude: -115.542088

For data sources see[1][2]

Well History

Date Event
2010-09-02 Obtained License
2010-09-28 Well Log Performed
2010-09-29 Surface Casing Operation Performed
2010-09-30 Well Log Performed
2010-10-02 Direction Drilling Operation Performed - Horizontal
2010-10-11 Finished Drilling
2010-10-11 Perforation Treatment Performed - Open-Hole Completion
2010-10-11 Well Mode changed to Drilled and Cased
2010-10-13 Liner Casing Operation Performed
2010-10-13 Production Casing Operation Performed
2010-10-14 Rig Released
2010-11-03 Well Log Performed
2010-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-12 Well Began Production
2010-12-12 Well Fluid changed to Crude Oil
2010-12-12 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-02 1420.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-11 Open Hole/Barefoot Completion 1978.00 3546.00 0
2010-12-08 Multi-Stage Fracture 2942.10 2942.20 0
2010-12-08 Multi-Stage Fracture 2871.70 2871.80 0
2010-12-08 Multi-Stage Fracture 2801.50 2801.60 0
2010-12-08 Multi-Stage Fracture 2732.00 2732.10 0
2010-12-09 Multi-Stage Fracture 2662.00 2662.10 0
2010-12-09 Multi-Stage Fracture 2591.90 2592.00 0
2010-12-09 Multi-Stage Fracture 2521.90 2522.00 0
2010-12-09 Multi-Stage Fracture 2452.00 2452.10 0
2010-12-09 Multi-Stage Fracture 2382.20 2382.30 0
2010-12-09 Multi-Stage Fracture 2311.70 2311.80 0
2010-12-07 Multi-Stage Fracture 3512.50 3512.60 0
2010-12-09 Multi-Stage Fracture 2230.70 2230.80 0
2010-12-09 Multi-Stage Fracture 2160.80 2160.90 0
2010-12-07 Multi-Stage Fracture 3445.70 3445.80 0
2010-12-07 Multi-Stage Fracture 3374.80 3374.90 0
2010-12-08 Multi-Stage Fracture 3304.10 3304.20 0
2010-12-08 Multi-Stage Fracture 3234.30 3234.40 0
2010-12-08 Multi-Stage Fracture 3163.70 3163.80 0
2010-12-08 Multi-Stage Fracture 3094.00 3094.10 0
2010-12-08 Multi-Stage Fracture 3012.40 3012.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 72 0.0 0.0 0.0
2011 7380 0.0 0.0 0.0
2012 8155 0.0 0.0 0.0
2013 8648 0.0 0.0 0.0
2014 8529 0.0 0.0 0.0
2015 8611 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8619 0.0 0.0 0.0
2018 8465 0.0 0.0 0.0
2019 8441 0.0 0.0 0.0
2020 1955 0.0 0.0 0.0

For data sources see[6]

References