If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485112202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.165415,"lon":-115.520246,"icon":""}]} |
| Location: 00/02-22-048-11W5/0 | |
| Location Alias: 00/02-22-48-11 W5M | |
| Location Alias 2: 00/02-22-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 22 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 2-22-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0438112 | |
| License Date: 2011-10-27 | |
| License Status: Issued | |
| Spud Date: 2012-08-13 | |
| Final Drill Date: 2012-08-24 | |
| Well Total Depth: 3448.00 m | |
| Surface Hole Latitude: 53.165415 | |
| Surface Hole Longitude: -115.520246 |
| Date | Event |
|---|---|
| 2011-10-27 | Obtained License |
| 2012-08-15 | Surface Casing Operation Performed |
| 2012-08-16 | Well Log Performed |
| 2012-08-17 | Direction Drilling Operation Performed - Deviate |
| 2012-08-18 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-24 | Finished Drilling |
| 2012-08-24 | Well Log Performed |
| 2012-08-24 | Well Mode changed to Drilled and Cased |
| 2012-08-26 | Production Casing Operation Performed |
| 2012-08-27 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-27 | Rig Released |
| 2012-09-20 | Well Log Performed |
| 2012-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-13 | Well Began Production |
| 2012-10-13 | Well Fluid changed to Crude Oil |
| 2012-10-13 | Well Mode changed to Flowing |
| 2012-10-17 | Well Log Performed |
| 2012-12-10 | Well Fluid changed to Crude Oil |
| 2012-12-10 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-13 | Precision Drilling Corporation | 403 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-17 | 1470.00 | Deviate (5 - 79 degrees) |
| 2012-08-18 | 1885.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-27 | Open Hole/Barefoot Completion | 3447.00 | 3448.00 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 2825.90 | 2826.00 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 2750.20 | 2750.30 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 2689.00 | 2689.10 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2613.10 | 2613.20 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2538.20 | 2538.30 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2462.50 | 2462.60 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2387.30 | 2387.40 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2311.70 | 2311.80 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2236.10 | 2236.20 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2160.50 | 2160.60 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3421.60 | 3421.70 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2084.70 | 2084.80 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 2022.90 | 2023.00 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3340.00 | 3340.10 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3278.30 | 3278.40 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3204.20 | 3204.30 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3128.20 | 3128.30 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 3052.30 | 3052.40 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 2976.70 | 2976.80 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 2901.20 | 2901.30 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 946 | 0.0 | 0.0 | 0.0 |
| 2013 | 8641 | 0.0 | 0.0 | 0.0 |
| 2014 | 8645 | 0.0 | 0.0 | 0.0 |
| 2015 | 8522 | 0.0 | 0.0 | 0.0 |
| 2016 | 8492 | 0.0 | 0.0 | 0.0 |
| 2017 | 8721 | 0.0 | 0.0 | 0.0 |
| 2018 | 8576 | 0.0 | 0.0 | 0.0 |
| 2019 | 8590 | 0.0 | 0.0 | 0.0 |
| 2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-27 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]