If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485112311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.165415,"lon":-115.519417,"icon":""}]} |
| Location: 00/11-23-048-11W5/0 | |
| Location Alias: 00/11-23-48-11 W5M | |
| Location Alias 2: 00/11-23-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 23 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ PEMBINA 11-23-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0494958 | |
| License Date: 2019-06-21 | |
| License Status: Issued | |
| Spud Date: 2019-09-23 | |
| Final Drill Date: 2019-09-29 | |
| Well Total Depth: 3364.00 m | |
| Surface Hole Latitude: 53.165415 | |
| Surface Hole Longitude: -115.519417 |
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-09-23 | Horizon Drilling Inc. | 39 | Drill To LD |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-09-25 | 670.10 | Deviate (5 - 79 degrees) |
| 2019-09-26 | 2049.40 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-09-30 | Open Hole/Barefoot Completion | 3361.00 | 3364.00 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3072.80 | 3072.90 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3034.60 | 3034.70 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3008.80 | 3008.90 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2970.10 | 2970.20 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2944.30 | 2944.40 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2904.50 | 2904.60 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2878.50 | 2878.60 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2839.10 | 2839.20 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2813.30 | 2813.40 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2773.40 | 2773.50 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3328.60 | 3328.70 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 2746.70 | 2746.80 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2706.40 | 2706.50 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2681.00 | 2681.10 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2654.10 | 2654.20 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2614.40 | 2614.50 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2588.80 | 2588.90 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2551.00 | 2551.10 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2515.00 | 2515.10 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2487.30 | 2487.40 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2447.70 | 2447.80 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3301.30 | 3301.40 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2421.50 | 2421.60 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2394.00 | 2394.10 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2355.60 | 2355.70 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2328.90 | 2329.00 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2289.50 | 2289.60 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2262.50 | 2262.60 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2196.20 | 2196.30 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2157.20 | 2157.30 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2130.50 | 2130.60 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2090.90 | 2091.00 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3260.00 | 3260.10 | 0 |
| 2019-10-22 | Multi-Stage Fracture | 2063.80 | 2063.90 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3232.00 | 3232.10 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3204.30 | 3204.40 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3164.90 | 3165.00 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3137.90 | 3138.00 | 0 |
| 2019-10-21 | Multi-Stage Fracture | 3098.10 | 3098.20 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-10-21 | 2019-10-22 | 1,784 | 6,336 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Hydrochloric Acid | 7647-01-0 | 100 | 0.7108 | N/A | |||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.707 | N/A | ||||
| Water | 7732-18-5 | 100 | 95.4571 | N/A | ||||
| 40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.5428 | N/A | ||
| ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0075 | N/A | |
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0866 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0866 | N/A | ||||
| ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.1392 | N/A | |
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1392 | N/A | ||||
| ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0866 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0866 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0866 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-10-15 | 2019-10-22 | Central Water Distribution Facility | 6995 |
| 2019-10-21 | 2019-10-22 | Central Water Distribution Facility | 46 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 1398 | 0.0 | 0.0 | 0.0 |
| 2020 | 2104 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-09-30 | No Incident Encountered | 0.00 | 0.00 |
| 2019-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]