X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112401000

Well Details

Well ID: 0485112401000
Loading map...
Location: 00/01-24-048-11W5/0
Location Alias: 00/01-24-48-11 W5M
Location Alias 2: 00/01-24-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 24
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ PEMBINA 1-24-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0490848
License Date: 2018-09-07
License Status: Issued
Spud Date: 2018-10-09
Final Drill Date: 2018-10-16
Well Total Depth: 4400.00 m
Surface Hole Latitude: 53.172066
Surface Hole Longitude: -115.471953

For data sources see[1][2]

Well History

Date Event
2018-09-07 Obtained License
2018-10-09 Surface Casing Operation Performed
2018-10-10 Direction Drilling Operation Performed - Deviate
2018-10-11 Direction Drilling Operation Performed - Horizontal
2018-10-11 Well Log Performed
2018-10-16 Finished Drilling
2018-10-16 Well Log Performed
2018-10-16 Well Mode changed to Drilled and Cased
2018-10-18 Production Casing Operation Performed
2018-10-18 Rig Released
2018-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-03 Well Began Production
2019-01-03 Well Fluid changed to Crude Oil
2019-01-03 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-10-09 Nabors Drilling Canada Limited 15 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-10-10 1506.10 Deviate (5 - 79 degrees)
2018-10-11 1933.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-25 Multi-Stage Fracture 4362.00 4362.10 0
2018-11-26 Multi-Stage Fracture 3912.00 3912.10 0
2018-11-26 Multi-Stage Fracture 3862.00 3862.10 0
2018-11-26 Multi-Stage Fracture 3812.00 3812.10 0
2018-11-26 Multi-Stage Fracture 3762.00 3762.10 0
2018-11-26 Multi-Stage Fracture 3712.00 3712.10 0
2018-11-26 Multi-Stage Fracture 3662.00 3662.10 0
2018-11-26 Multi-Stage Fracture 3612.00 3612.10 0
2018-11-26 Multi-Stage Fracture 3562.00 3562.10 0
2018-11-26 Multi-Stage Fracture 3512.00 3512.10 0
2018-11-26 Multi-Stage Fracture 3462.00 3462.10 0
2018-11-25 Multi-Stage Fracture 4312.00 4312.10 0
2018-11-26 Multi-Stage Fracture 3412.00 3412.10 0
2018-11-26 Multi-Stage Fracture 3362.00 3362.10 0
2018-11-26 Multi-Stage Fracture 3312.00 3312.10 0
2018-11-26 Multi-Stage Fracture 3262.00 3262.10 0
2018-11-27 Multi-Stage Fracture 3212.00 3212.10 0
2018-11-27 Multi-Stage Fracture 3162.00 3162.10 0
2018-11-27 Multi-Stage Fracture 3112.00 3112.10 0
2018-11-27 Multi-Stage Fracture 3062.00 3062.10 0
2018-11-27 Multi-Stage Fracture 3012.00 3012.10 0
2018-11-27 Multi-Stage Fracture 2962.00 2962.10 0
2018-11-25 Multi-Stage Fracture 4262.00 4262.10 0
2018-11-27 Multi-Stage Fracture 2912.00 2912.10 0
2018-11-27 Multi-Stage Fracture 2862.00 2862.10 0
2018-11-27 Multi-Stage Fracture 2812.00 2812.10 0
2018-11-27 Multi-Stage Fracture 2762.00 2762.10 0
2018-11-27 Multi-Stage Fracture 2712.00 2712.10 0
2018-11-27 Multi-Stage Fracture 2662.00 2662.10 0
2018-11-27 Multi-Stage Fracture 2612.00 2612.10 0
2018-11-27 Multi-Stage Fracture 2562.00 2562.10 0
2018-11-27 Multi-Stage Fracture 2512.00 2512.10 0
2018-11-27 Multi-Stage Fracture 2412.00 2412.10 0
2018-11-25 Multi-Stage Fracture 4212.00 4212.10 0
2018-11-27 Multi-Stage Fracture 2362.00 2362.10 0
2018-11-27 Multi-Stage Fracture 2312.00 2312.10 0
2018-11-27 Multi-Stage Fracture 2262.00 2262.10 0
2018-11-27 Multi-Stage Fracture 2212.00 2212.10 0
2018-11-28 Multi-Stage Fracture 2162.00 2162.10 0
2018-11-28 Multi-Stage Fracture 2112.00 2112.10 0
2018-11-28 Multi-Stage Fracture 2062.00 2062.10 0
2018-11-28 Multi-Stage Fracture 2012.00 2012.10 0
2018-11-28 Multi-Stage Fracture 1962.00 1962.10 0
2018-11-25 Multi-Stage Fracture 4162.00 4162.10 0
2018-11-25 Multi-Stage Fracture 4112.00 4112.10 0
2018-11-26 Multi-Stage Fracture 4062.00 4062.10 0
2018-11-26 Multi-Stage Fracture 4012.00 4012.10 0
2018-11-26 Multi-Stage Fracture 3962.00 3962.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-25 2018-11-28 1,807 6,244 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 1.0959 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 1.0834 N/A
Water 7732-18-5 100 94.7177 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 5.3946 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0084 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0084 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0087 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0902 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0902 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0558 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0558 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0917 N/A
Methanol 67-56-1 100 0.0917 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0917 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-19 2018-11-22 Surface Water - River 7993
2018-11-25 2018-11-25 Central Water Distribution Facility 70

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 8684 0.0 0.0 0.0
2020 2046 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-18 No Incident Encountered 0.00 0.00
2018-11-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References