X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112413000

Well Details

Well ID: 0485112413000
Loading map...
Location: 00/13-24-048-11W5/0
Location Alias: 00/13-24-48-11 W5M
Location Alias 2: 00/13-24-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 24
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 13-24-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0414347
License Date: 2009-11-23
License Status: Amended
Spud Date: 2009-12-04
Final Drill Date: 2009-12-16
Well Total Depth: 2806.00 m
Surface Hole Latitude: 53.170009
Surface Hole Longitude: -115.499264

For data sources see[1][2]

Well History

Date Event
2009-11-23 Obtained License
2009-12-06 Surface Casing Operation Performed
2009-12-08 Direction Drilling Operation Performed - Horizontal
2009-12-16 Finished Drilling
2009-12-16 Well Mode changed to Drilled and Cased
2009-12-17 Well Log Performed
2009-12-18 Production Casing Operation Performed
2009-12-19 Rig Released
2010-01-09 Well Log Performed
2010-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2010-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-01 Well Log Performed
2010-05-01 Well Began Production
2010-05-01 Well Fluid changed to Crude Oil
2010-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-08 1584.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-12 Multi-Stage Fracture 2780.40 2780.90 0
2010-03-15 Multi-Stage Fracture 2030.00 2030.50 0
2010-03-15 Multi-Stage Fracture 1882.00 1882.50 0
2010-01-13 Multi-Stage Fracture 2701.70 2702.20 0
2010-01-13 Multi-Stage Fracture 2680.00 2680.50 0
2010-03-14 Multi-Stage Fracture 2564.00 2564.50 0
2010-03-14 Multi-Stage Fracture 2495.40 2495.90 0
2010-03-14 Multi-Stage Fracture 2414.00 2414.50 0
2010-03-14 Multi-Stage Fracture 2335.00 2335.50 0
2010-03-14 Multi-Stage Fracture 2251.00 2251.50 0
2010-03-15 Multi-Stage Fracture 2125.00 2125.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5250 0.0 0.0 0.0
2011 8147 0.0 0.0 0.0
2012 7960 0.0 0.0 0.0
2013 8327 0.0 0.0 0.0
2014 8302 0.0 0.0 0.0
2015 8664 0.0 0.0 0.0
2016 8201 0.0 0.0 0.0
2017 8396 0.0 0.0 0.0
2018 8342 0.0 0.0 0.0
2019 8664 0.0 0.0 0.0
2020 1969 0.0 0.0 0.0

For data sources see[6]

References