X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112610020

Well Details

Well ID: 0485112610020
Loading map...
Location: 02/10-26-048-11W5/0
Location Alias: 02/10-26-48-11 W5M
Location Alias 2: 02/10-26-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 26
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ PEMBINA 10-26-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0494704
License Date: 2019-06-03
License Status: Amended
Spud Date: 2019-10-11
Final Drill Date: 2019-10-18
Well Total Depth: 4348.00 m
Surface Hole Latitude: 53.193696
Surface Hole Longitude: -115.508088

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-10-13 1394.70 Deviate (5 - 79 degrees)
2019-10-14 2019.30 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-10-19 Open Hole/Barefoot Completion 4340.00 4348.00 0
2019-10-30 Multi-Stage Fracture 3907.20 3907.30 0
2019-10-30 Multi-Stage Fracture 3853.00 3853.10 0
2019-10-30 Multi-Stage Fracture 3798.00 3798.10 0
2019-10-30 Multi-Stage Fracture 3757.80 3757.90 0
2019-10-30 Multi-Stage Fracture 3705.10 3705.20 0
2019-10-30 Multi-Stage Fracture 3649.60 3649.70 0
2019-10-30 Multi-Stage Fracture 3594.20 3594.30 0
2019-10-30 Multi-Stage Fracture 3552.80 3552.90 0
2019-10-30 Multi-Stage Fracture 3497.20 3497.30 0
2019-10-30 Multi-Stage Fracture 3442.60 3442.70 0
2019-10-29 Multi-Stage Fracture 4308.40 4308.50 0
2019-10-30 Multi-Stage Fracture 3400.90 3401.00 0
2019-10-30 Multi-Stage Fracture 3346.40 3346.50 0
2019-10-30 Multi-Stage Fracture 3290.90 3291.00 0
2019-10-30 Multi-Stage Fracture 3237.30 3237.40 0
2019-10-30 Multi-Stage Fracture 3198.00 3198.10 0
2019-10-30 Multi-Stage Fracture 3144.30 3144.40 0
2019-10-30 Multi-Stage Fracture 3090.10 3090.20 0
2019-10-30 Multi-Stage Fracture 3035.10 3035.20 0
2019-10-30 Multi-Stage Fracture 2994.20 2994.30 0
2019-10-30 Multi-Stage Fracture 2938.90 2939.00 0
2019-10-29 Multi-Stage Fracture 4266.80 4266.90 0
2019-10-30 Multi-Stage Fracture 2886.80 2886.90 0
2019-10-30 Multi-Stage Fracture 2836.20 2836.30 0
2019-10-31 Multi-Stage Fracture 2780.90 2781.00 0
2019-10-31 Multi-Stage Fracture 2739.70 2739.80 0
2019-10-31 Multi-Stage Fracture 2685.20 2685.30 0
2019-10-31 Multi-Stage Fracture 2629.80 2629.90 0
2019-10-31 Multi-Stage Fracture 2575.40 2575.50 0
2019-10-31 Multi-Stage Fracture 2534.20 2534.30 0
2019-10-31 Multi-Stage Fracture 2479.30 2479.40 0
2019-10-31 Multi-Stage Fracture 2424.50 2424.60 0
2019-10-30 Multi-Stage Fracture 4211.30 4211.40 0
2019-10-31 Multi-Stage Fracture 2370.00 2370.10 0
2019-10-31 Multi-Stage Fracture 2328.70 2328.80 0
2019-10-31 Multi-Stage Fracture 2273.70 2273.80 0
2019-10-31 Multi-Stage Fracture 2218.60 2218.70 0
2019-10-31 Multi-Stage Fracture 2176.70 2176.80 0
2019-10-31 Multi-Stage Fracture 2121.40 2121.50 0
2019-10-31 Multi-Stage Fracture 2067.40 2067.50 0
2019-10-30 Multi-Stage Fracture 4156.00 4156.10 0
2019-10-30 Multi-Stage Fracture 4114.30 4114.40 0
2019-10-30 Multi-Stage Fracture 4059.70 4059.80 0
2019-10-30 Multi-Stage Fracture 4004.10 4004.20 0
2019-10-30 Multi-Stage Fracture 3962.60 3962.70 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-29 2019-10-31 1,831 7,253 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.677 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.6736 N/A
Water 7732-18-5 100 95.1466 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.8533 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.0118 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0872 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0872 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.1023 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.1023 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0859 N/A
Methanol 67-56-1 100 0.0859 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0859 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1222 0.0 0.0 0.0
2020 2105 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-19 No Incident Encountered 0.00 0.00
2019-11-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References