If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485112613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.165831,"lon":-115.494143,"icon":""}]} |
| Location: 00/13-26-048-11W5/0 | |
| Location Alias: 00/13-26-48-11 W5M | |
| Location Alias 2: 00/13-26-048-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 26 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK HZ PEMBINA 13-26-48-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0494702 | |
| License Date: 2019-06-03 | |
| License Status: Issued | |
| Spud Date: 2019-10-02 | |
| Final Drill Date: 2019-10-07 | |
| Well Total Depth: 3340.00 m | |
| Surface Hole Latitude: 53.165831 | |
| Surface Hole Longitude: -115.494143 |
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-10-02 | Horizon Drilling Inc. | 39 | Drill To LD |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-10-04 | 1501.60 | Deviate (5 - 79 degrees) |
| 2019-10-04 | 1945.40 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-10-09 | Open Hole/Barefoot Completion | 3336.00 | 3340.00 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 2964.40 | 2964.50 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2923.90 | 2924.00 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2870.60 | 2870.70 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2829.50 | 2829.60 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2775.50 | 2775.60 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2735.10 | 2735.20 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2681.60 | 2681.70 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2641.60 | 2641.70 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2586.80 | 2586.90 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2547.30 | 2547.40 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3303.90 | 3304.00 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2496.20 | 2496.30 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2455.40 | 2455.50 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2400.20 | 2400.30 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2360.00 | 2360.10 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2306.80 | 2306.90 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2265.30 | 2265.40 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2211.50 | 2211.60 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2170.90 | 2171.00 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2117.50 | 2117.60 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2077.00 | 2077.10 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3263.70 | 3263.80 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 2021.90 | 2022.00 | 0 |
| 2020-02-12 | Multi-Stage Fracture | 1979.80 | 1979.90 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3224.20 | 3224.30 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3183.40 | 3183.50 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3142.70 | 3142.80 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3100.60 | 3100.70 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3059.00 | 3059.10 | 0 |
| 2020-02-11 | Multi-Stage Fracture | 3018.90 | 3019.00 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2020-02-11 | 2020-02-12 | 1,808 | 4,349 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 95.0292 | N/A | |||
| 40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.9707 | N/A | ||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0185 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0185 | N/A | ||||
| ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.0087 | N/A | |
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0874 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0874 | N/A | ||||
| Nitrogen | Element | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 0.7706 | N/A | |
| ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0043 | N/A | |
| Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0043 | N/A | ||||
| ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0939 | N/A | |
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0939 | N/A | ||||
| ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0874 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0874 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0874 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2020-02-11 | 2020-02-12 | Surface Water - Lake | 4434 |
| 2020-02-11 | 2020-02-11 | Central Water Distribution Facility | 35 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2020 | 786 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-10-09 | No Incident Encountered | 0.00 | 0.00 |
| 2020-02-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]