X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485112803000

Well Details

Well ID: 0485112803000
Loading map...
Location: 00/03-28-048-11W5/0
Location Alias: 00/03-28-48-11 W5M
Location Alias 2: 00/03-28-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 28
County/Municipality: Brazeau County
Well Name: INPLAY OIL PEMBINA 3-28-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0444063
License Date: 2012-02-10
License Status: Issued
Spud Date: 2012-02-26
Final Drill Date: 2012-03-14
Well Total Depth: 3326.00 m
Surface Hole Latitude: 53.179141
Surface Hole Longitude: -115.552829

For data sources see[1][2]

Well History

Date Event
2012-02-10 Obtained License
2012-02-28 Surface Casing Operation Performed
2012-03-02 Direction Drilling Operation Performed - Deviate
2012-03-03 Direction Drilling Operation Performed - Horizontal
2012-03-05 Intermediate Casing Operation Performed
2012-03-05 Well Log Performed
2012-03-14 Finished Drilling
2012-03-14 Well Log Performed
2012-03-14 Well Mode changed to Drilled and Cased
2012-03-16 Liner Casing Operation Performed
2012-03-18 Rig Released
2012-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-26 Well Began Production
2012-03-26 Well Fluid changed to Crude Oil
2012-03-26 Well Mode changed to Flowing
2012-03-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Well Fluid changed to Crude Oil
2018-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-26 Chinook Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-02 1530.00 Deviate (5 - 79 degrees)
2012-03-03 1902.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-25 Multi-Stage Fracture 3300.30 3300.40 0
2012-03-27 Multi-Stage Fracture 2563.30 2563.40 0
2012-03-27 Multi-Stage Fracture 2482.80 2482.90 0
2012-03-27 Multi-Stage Fracture 2403.70 2403.80 0
2012-03-27 Multi-Stage Fracture 2323.40 2323.50 0
2012-03-27 Multi-Stage Fracture 2242.10 2242.20 0
2012-03-27 Multi-Stage Fracture 2161.00 2161.10 0
2012-03-27 Multi-Stage Fracture 2079.70 2079.80 0
2012-03-27 Multi-Stage Fracture 1998.40 1998.50 0
2012-03-25 Multi-Stage Fracture 3214.30 3214.40 0
2012-03-25 Multi-Stage Fracture 3134.30 3134.40 0
2012-03-25 Multi-Stage Fracture 3050.70 3050.80 0
2012-03-25 Multi-Stage Fracture 2979.80 2979.90 0
2012-03-25 Multi-Stage Fracture 2895.80 2895.90 0
2012-03-27 Multi-Stage Fracture 2812.50 2812.60 0
2012-03-27 Multi-Stage Fracture 2728.60 2728.70 0
2012-03-27 Multi-Stage Fracture 2645.20 2645.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6360 0.0 0.0 0.0
2013 8234 0.0 0.0 0.0
2014 8649 0.0 0.0 0.0
2015 8674 0.0 0.0 0.0
2016 8691 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8600 0.0 0.0 0.0
2019 8459 0.0 0.0 0.0
2020 2080 0.0 0.0 0.0

For data sources see[7]

References