X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485120311000

Well Details

Well ID: 0485120311000
Loading map...
Location: 00/11-03-048-12W5/0
Location Alias: 00/11-03-48-12 W5M
Location Alias 2: 00/11-03-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 03
County/Municipality: Yellowhead County
Well Name: ACL BRAZR 11-3-48-12
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0151542
License Date: 1992-01-28
License Status: Suspension
Spud Date: 1992-02-09
Final Drill Date: 1992-03-22
Well Total Depth: 3205.00 m
Surface Hole Latitude: 53.115923
Surface Hole Longitude: -115.676488

For data sources see[1][2]

Well History

Date Event
1992-01-28 Obtained License
1992-02-14 Surface Casing Operation Performed
1992-03-08 Well Log Performed
1992-03-11 Intermediate Casing Operation Performed
1992-03-22 Finished Drilling
1992-03-22 Well Log Performed
1992-03-22 Well Mode changed to Drilled and Cased
1992-03-23 Well Log Performed
1992-03-25 Liner Casing Operation Performed
1992-03-27 Rig Released
1992-04-10 Well Log Performed
1992-04-11 Well Log Performed
1992-04-16 Perforation Treatment Performed - Jet Perforation
1992-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-01 Well Began Injection
1992-07-01 Well Fluid changed to Gas
1992-07-01 Well Type changed to Injection
1993-04-10 Well Log Performed
2001-02-01 Well Began Production
2001-02-01 Well Fluid changed to Gas
2001-02-01 Well Mode changed to Flowing
2015-01-22 Well Fluid changed to Gas
2015-01-22 Well Mode changed to Suspended
2020-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-11 Perforation Treatment Performed - Cement Squeeze
2020-01-11 Plug Back Performed
2020-01-11 Well Fluid changed to Gas
2020-01-11 Well Mode changed to Abandoned Zone
2020-01-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-16 Perforation 3105.00 3113.00 13
1992-04-16 Perforation 3121.00 3131.00 13
1992-04-17 Acid Treatment 3105.00 3131.00 0
2020-01-11 Cement Squeeze 3105.00 3131.00 0
2020-01-11 Packing Device Capped w/Cement 2877.50 3074.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2001 7954 0.0 0.0 0.0
2002 8462 0.0 0.0 0.0
2003 8085 0.0 0.0 0.0
2004 7852 0.0 0.0 0.0
2005 8431 0.0 0.0 0.0
2006 8547 0.0 0.0 0.0
2007 8048 0.0 0.0 0.0
2008 8337 0.0 0.0 0.0
2009 8145 0.0 0.0 0.0
2010 7863 0.0 0.0 0.0
2011 8579 0.0 0.0 0.0
2012 8450 0.0 0.0 0.0
2013 7628 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References