X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485120709002

Well Details

Well ID: 0485120709002
Loading map...
Location: 00/09-07-048-12W5/2
Location Alias: 00/09-07-48-12 W5M
Location Alias 2: 00/09-07-048-12 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 07
County/Municipality: Yellowhead County
Well Name: TIDEWATER BRAZR 9-7-48-12
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0084861
License Date: 1980-08-12
License Status: Issued
Spud Date: 1980-08-23
Final Drill Date: 1981-02-21
Well Total Depth: 3405.00 m
Surface Hole Latitude: 53.124364
Surface Hole Longitude: -115.739075

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-12 Obtained License
1980-08-23 Direction Drilling Operation Performed - 98
1980-09-05 Lost Circulation Occurred
1981-02-11 Well Log Performed
1981-02-21 Finished Drilling
1981-02-21 Well Mode changed to Drilled and Cased
1981-02-25 Drill Stem Test Performed
1981-02-26 Liner Casing Operation Performed
1981-05-15 Perforation Treatment Performed - Jet Perforation
1982-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-13 Perforation Treatment Performed - Cement Squeeze
1982-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-27 Perforation Treatment Performed - Jet Perforation
1982-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-21 Well Log Performed
2011-04-18 Well Log Performed
2011-04-21 Well Log Performed
2011-04-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-04-26 Perforation Treatment Performed - Jet Perforation
2011-04-26 Plug Back Performed
2011-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-04-30 Well Log Performed
2012-02-01 Well Began Injection
2012-02-01 Well Fluid changed to Water
2012-02-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-08-23 1606.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-05-15 Perforation 3287.00 3288.50 4
2011-04-26 Perforation 3167.00 3170.00 17
2011-04-26 Perforation 3129.00 3134.00 17
2011-04-26 Perforation 3087.00 3092.00 17
2011-04-26 Perforation 3044.00 3046.00 17
2011-04-28 Acid Treatment 3044.00 3170.00 0
1981-05-15 Perforation 3300.00 3302.00 4
1981-05-15 Perforation 3291.00 3295.00 4
1982-06-16 Acid Treatment 3287.00 3302.00 0
1982-11-13 Cement Squeeze 3287.00 3302.00 0
1982-11-27 Perforation 3291.00 3294.00 13
1982-11-27 Acid Treatment 3291.00 3294.00 0
1982-11-29 Acid Treatment 3291.00 3294.00 0
2011-04-26 Packing Device Capped w/Cement 3267.00 3275.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-09-05 Lost Circulation 370.00 441.00

For data sources see[7]

References