If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485121016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.119972,"lon":-115.66181,"icon":""}]} |
Location: 00/16-10-048-12W5/0 | |
Location Alias: 00/16-10-48-12 W5M | |
Location Alias 2: 00/16-10-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: MANCAL BRAZR 16-10-48-12 | |
Operator Name: Mancal Energy Inc. | |
License Number: 0436058 | |
License Date: 2011-08-16 | |
License Status: Issued | |
Spud Date: 2011-09-08 | |
Final Drill Date: 2011-10-11 | |
Well Total Depth: 3577.00 m | |
Surface Hole Latitude: 53.119972 | |
Surface Hole Longitude: -115.661810 |
Date | Event |
---|---|
2011-08-16 | Obtained License |
2011-09-10 | Surface Casing Operation Performed |
2011-09-16 | Direction Drilling Operation Performed - Deviate |
2011-09-23 | Direction Drilling Operation Performed - Horizontal |
2011-09-27 | Intermediate Casing Operation Performed |
2011-10-11 | Finished Drilling |
2011-10-11 | Well Log Performed |
2011-10-11 | Well Mode changed to Drilled and Cased |
2011-10-13 | Liner Casing Operation Performed |
2011-10-13 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-14 | Well Log Performed |
2011-10-17 | Rig Released |
2011-10-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-02 | Well Began Production |
2011-11-02 | Well Fluid changed to Gas |
2011-11-02 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-16 | 2020.00 | Deviate (5 - 79 degrees) |
2011-09-23 | 2475.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-13 | Open Hole/Barefoot Completion | 3432.10 | 3577.00 | 0 |
2011-10-26 | Multi-Stage Fracture | 3408.00 | 3410.00 | 0 |
2011-10-31 | Multi-Stage Fracture | 3363.80 | 3364.80 | 0 |
2011-10-31 | Multi-Stage Fracture | 3285.00 | 3286.00 | 0 |
2011-10-31 | Multi-Stage Fracture | 3192.70 | 3193.70 | 0 |
2011-10-31 | Multi-Stage Fracture | 3128.70 | 3129.70 | 0 |
2011-10-31 | Multi-Stage Fracture | 3046.20 | 3047.20 | 0 |
2011-10-31 | Multi-Stage Fracture | 2963.50 | 2964.50 | 0 |
2011-10-31 | Multi-Stage Fracture | 2892.70 | 2893.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1336 | 0.0 | 0.0 | 0.0 |
2012 | 8722 | 0.0 | 0.0 | 0.0 |
2013 | 8663 | 0.0 | 0.0 | 0.0 |
2014 | 7950 | 0.0 | 0.0 | 0.0 |
2015 | 8512 | 0.0 | 0.0 | 0.0 |
2016 | 8664 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8495 | 0.0 | 0.0 | 0.0 |
2019 | 7957 | 0.0 | 0.0 | 0.0 |
2020 | 992 | 0.0 | 0.0 | 0.0 |
For data sources see[6]