If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485121912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.159291,"lon":-115.752819,"icon":""}]} |
Location: 00/12-19-048-12W5/0 | |
Location Alias: 00/12-19-48-12 W5M | |
Location Alias 2: 00/12-19-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 19 | |
County/Municipality: Yellowhead County | |
Well Name: TIDEWATER BRAZR 12-19-48-12 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0068976 | |
License Date: 1978-03-27 | |
License Status: Issued | |
Spud Date: 1978-05-01 | |
Final Drill Date: 1978-07-08 | |
Well Total Depth: 3253.70 m | |
Surface Hole Latitude: 53.159291 | |
Surface Hole Longitude: -115.752819 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-03-27 | Obtained License |
1978-06-30 | Drill Stem Test Performed |
1978-07-06 | Liner Casing Operation Performed |
1978-07-08 | Finished Drilling |
1978-07-08 | Perforation Treatment Performed - Open-Hole Completion |
1978-07-08 | Well Log Performed |
1978-07-08 | Well Mode changed to Drilled and Cased |
1978-07-13 | Drill Stem Test Performed |
1978-07-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-15 | Well Began Production |
1978-10-15 | Well Fluid changed to Crude Oil |
1978-10-15 | Well Mode changed to Flowing |
1978-10-16 | Perforation Treatment Performed - Fractured |
1980-11-01 | Perforation Treatment Performed - Selective Jet Perforations |
1980-11-29 | Perforation Treatment Performed - Cement Squeeze |
1980-12-04 | Well Log Performed |
1980-12-08 | Perforation Treatment Performed - Jet Perforation |
1980-12-16 | Perforation Treatment Performed - Fractured |
1987-03-01 | Well Fluid changed to Crude Oil |
1987-03-01 | Well Mode changed to Suspended |
1988-05-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-21 | Well Fluid changed to Crude Oil |
1988-08-21 | Well Mode changed to Flowing |
1990-02-01 | Well Fluid changed to Crude Oil |
1990-02-01 | Well Mode changed to Suspended |
1990-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-10-09 | Well Fluid changed to Crude Oil |
1990-10-09 | Well Mode changed to Pumping |
1990-12-01 | Well Fluid changed to Crude Oil |
1990-12-01 | Well Mode changed to Suspended |
2004-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-11-23 | Well Fluid changed to Crude Oil |
2004-11-23 | Well Mode changed to Pumping |
2010-08-01 | Well Fluid changed to Crude Oil |
2010-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-07-08 | Open Hole/Barefoot Completion | 3074.80 | 3253.70 | 0 |
1988-05-26 | Acid Treatment | 3136.40 | 3166.30 | 0 |
1990-10-04 | Acid Treatment | 3136.40 | 3166.30 | 0 |
2004-10-23 | Acid Treatment | 3157.70 | 3166.30 | 0 |
2004-10-23 | Acid Treatment | 3141.90 | 3145.90 | 0 |
2004-10-23 | Acid Treatment | 3136.40 | 3138.80 | 0 |
1978-07-22 | Acid Treatment | 3074.80 | 3253.70 | 0 |
1978-10-16 | Fracture | 3074.80 | 3253.70 | 0 |
1980-11-01 | Selective Jet Perforations | 3038.60 | 3038.60 | 0 |
1980-11-29 | Cement Squeeze | 3074.80 | 3253.70 | 0 |
1980-12-08 | Perforation | 3136.40 | 3138.80 | 7 |
1980-12-08 | Perforation | 3141.90 | 3145.90 | 7 |
1980-12-08 | Perforation | 3157.70 | 3166.30 | 7 |
1980-12-16 | Fracture | 3136.40 | 3166.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1056 | 0.0 | 0.0 | 0.0 |
1979 | 1381 | 0.0 | 0.0 | 0.0 |
1980 | 655 | 0.0 | 0.0 | 0.0 |
1981 | 700 | 0.0 | 0.0 | 0.0 |
1982 | 1066 | 0.0 | 0.0 | 0.0 |
1983 | 832 | 0.0 | 0.0 | 0.0 |
1984 | 4479 | 0.0 | 0.0 | 0.0 |
1985 | 5664 | 0.0 | 0.0 | 0.0 |
1986 | 1166 | 0.0 | 0.0 | 0.0 |
1988 | 3005 | 0.0 | 0.0 | 0.0 |
1989 | 2652 | 0.0 | 0.0 | 0.0 |
1990 | 732 | 0.0 | 0.0 | 0.0 |
2004 | 332 | 0.0 | 0.0 | 0.0 |
2005 | 2776 | 0.0 | 0.0 | 0.0 |
2010 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[5]