If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485122003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.150137,"lon":-115.725905,"icon":""}]} |
| Location: 00/03-20-048-12W5/0 | |
| Location Alias: 00/03-20-48-12 W5M | |
| Location Alias 2: 00/03-20-048-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: TIDEWATER BRAZR 3-20-48-12 | |
| Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
| License Number: 0069676 | |
| License Date: 1978-05-23 | |
| License Status: Suspension | |
| Spud Date: 1978-07-06 | |
| Final Drill Date: 1978-09-03 | |
| Well Total Depth: 3229.00 m | |
| Surface Hole Latitude: 53.150137 | |
| Surface Hole Longitude: -115.725905 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1978-05-23 | Obtained License |
| 1978-07-06 | Lost Circulation Occurred |
| 1978-09-03 | Finished Drilling |
| 1978-09-05 | Liner Casing Operation Performed |
| 1978-09-24 | Perforation Treatment Performed - Jet Perforation |
| 1978-09-24 | Well Log Performed |
| 1978-09-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-10-06 | Well Mode changed to Drilled and Cased |
| 1981-11-12 | Perforation Treatment Performed - Jet Perforation |
| 1981-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-12-29 | Well Mode changed to Drilled and Cased |
| 1985-01-23 | Well Log Performed |
| 1985-08-10 | Well Began Production |
| 1985-08-10 | Well Fluid changed to Gas |
| 1985-08-10 | Well Mode changed to Flowing |
| 1990-07-01 | Well Began Injection |
| 1990-07-01 | Well Fluid changed to Gas |
| 1990-07-01 | Well Type changed to Injection |
| 1999-04-30 | Well Fluid changed to Gas |
| 1999-04-30 | Well Mode changed to Suspended |
| 1999-04-30 | Well Type changed to Injection |
| 2001-05-25 | Well Fluid changed to Gas |
| 2001-05-25 | Well Mode changed to Flowing |
| 2012-07-06 | Well Log Performed |
| 2012-07-21 | Well Log Performed |
| 2018-01-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2020-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2020-02-11 | Perforation Treatment Performed - Cement Squeeze |
| 2020-02-11 | Plug Back Performed |
| 2020-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2020-02-12 | Well Log Performed |
| 2020-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2020-02-13 | Perforation Treatment Performed - Remedial Casing |
| 2020-02-13 | Well Fluid changed to Gas |
| 2020-02-13 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-09-24 | Perforation | 3156.00 | 3161.00 | 6 |
| 2020-02-13 | Remedial Casing Cementing | 599.00 | 601.00 | 0 |
| 2020-02-13 | Packing Device Capped w/Cement | 553.00 | 594.00 | 0 |
| 1978-09-26 | Acid Treatment | 3156.00 | 3161.00 | 0 |
| 1981-11-12 | Perforation | 3130.00 | 3140.00 | 13 |
| 1981-11-13 | Acid Treatment | 3130.00 | 3161.00 | 0 |
| 2018-01-18 | Acid Treatment | 3156.00 | 3161.00 | 0 |
| 2018-01-18 | Acid Treatment | 3130.00 | 3140.00 | 0 |
| 2020-02-11 | Cement Squeeze | 3130.00 | 3161.00 | 0 |
| 2020-02-11 | Packing Device Capped w/Cement | 2780.00 | 2941.80 | 0 |
| 2020-02-12 | Perforation | 599.00 | 601.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 141 | 0.0 | 0.0 | 0.0 |
| 1981 | 148 | 0.0 | 0.0 | 0.0 |
| 1984 | 584 | 0.0 | 0.0 | 0.0 |
| 1985 | 2415 | 0.0 | 0.0 | 0.0 |
| 1986 | 4190 | 0.0 | 0.0 | 0.0 |
| 1988 | 1010 | 0.0 | 0.0 | 0.0 |
| 1989 | 4185 | 0.0 | 0.0 | 0.0 |
| 1990 | 2762 | 0.0 | 0.0 | 0.0 |
| 1991 | 0 | 0.0 | 0.0 | 0.0 |
| 1992 | 0 | 0.0 | 0.0 | 0.0 |
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2001 | 5152 | 0.0 | 0.0 | 0.0 |
| 2002 | 8609 | 0.0 | 0.0 | 0.0 |
| 2003 | 8247 | 0.0 | 0.0 | 0.0 |
| 2004 | 7924 | 0.0 | 0.0 | 0.0 |
| 2005 | 7839 | 0.0 | 0.0 | 0.0 |
| 2006 | 8411 | 0.0 | 0.0 | 0.0 |
| 2007 | 7978 | 0.0 | 0.0 | 0.0 |
| 2008 | 8227 | 0.0 | 0.0 | 0.0 |
| 2009 | 8092 | 0.0 | 0.0 | 0.0 |
| 2010 | 7920 | 0.0 | 0.0 | 0.0 |
| 2011 | 8670 | 0.0 | 0.0 | 0.0 |
| 2012 | 3283 | 0.0 | 0.0 | 0.0 |
| 2013 | 6188 | 0.0 | 0.0 | 0.0 |
| 2014 | 7391 | 0.0 | 0.0 | 0.0 |
| 2015 | 7782 | 0.0 | 0.0 | 0.0 |
| 2016 | 8611 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1978-07-06 | Lost Circulation | 206.30 | 206.30 |
| 2012-07-20 | No Incident Encountered | 0.00 | 0.00 |
| 2018-01-19 | No Incident Encountered | 0.00 | 0.00 |
| 2020-02-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]