| Well ID: 0485123307022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.177018,"lon":-115.690739,"icon":""}]} |
| Location: 02/07-33-048-12W5/2 | |
| Location Alias: 02/07-33-48-12 W5M | |
| Location Alias 2: 02/07-33-048-12 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 33 | |
| County/Municipality: Yellowhead County | |
| Well Name: TIDEWATER BRAZR 15-28-48-12 | |
| Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
| License Number: 0097503 | |
| License Date: 1982-09-21 | |
| License Status: Suspension | |
| Spud Date: 1982-11-04 | |
| Final Drill Date: 1994-11-25 | |
| Well Total Depth: 3542.00 m | |
| Surface Hole Latitude: 53.177018 | |
| Surface Hole Longitude: -115.690739 |
| Date | Event |
|---|---|
| 1982-09-21 | Obtained License |
| 1983-02-09 | Liner Casing Operation Performed |
| 1994-10-28 | Well Log Performed |
| 1994-11-10 | Direction Drilling Operation Performed - Horizontal |
| 1994-11-25 | Finished Drilling |
| 1994-11-25 | Well Mode changed to Drilled and Cased |
| 1994-11-26 | Well Log Performed |
| 1994-11-30 | Well Log Performed |
| 1994-12-01 | Well Log Performed |
| 1994-12-02 | Liner Casing Operation Performed |
| 1994-12-05 | Rig Released |
| 1994-12-05 | Well Log Performed |
| 1994-12-14 | Well Log Performed |
| 1994-12-18 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-12-30 | Well Began Production |
| 1994-12-30 | Well Fluid changed to Crude Oil |
| 1994-12-30 | Well Mode changed to Flowing |
| 2011-11-01 | Well Fluid changed to Crude Oil |
| 2011-11-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-11-10 | 2825.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-12-18 | Open Hole/Barefoot Completion | 3237.60 | 3542.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 45 | 0.0 | 0.0 | 0.0 |
| 1995 | 8150 | 0.0 | 0.0 | 0.0 |
| 1996 | 8643 | 0.0 | 0.0 | 0.0 |
| 1997 | 8635 | 0.0 | 0.0 | 0.0 |
| 1998 | 8749 | 0.0 | 0.0 | 0.0 |
| 1999 | 8661 | 0.0 | 0.0 | 0.0 |
| 2000 | 8067 | 0.0 | 0.0 | 0.0 |
| 2001 | 8007 | 0.0 | 0.0 | 0.0 |
| 2002 | 8181 | 0.0 | 0.0 | 0.0 |
| 2003 | 931 | 0.0 | 0.0 | 0.0 |
For data sources see[6]