If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485130306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.110283,"lon":-115.822866,"icon":""}]} |
| Location: 00/06-03-048-13W5/0 | |
| Location Alias: 00/06-03-48-13 W5M | |
| Location Alias 2: 00/06-03-048-13 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 13 | |
| Section: 03 | |
| County/Municipality: Yellowhead County | |
| Well Name: TIDEWATER BRAZR 6-3-48-13 | |
| Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
| License Number: 0142661 | |
| License Date: 1990-01-10 | |
| License Status: Issued | |
| Spud Date: 1990-02-16 | |
| Final Drill Date: 1990-04-14 | |
| Well Total Depth: 3323.00 m | |
| Surface Hole Latitude: 53.110283 | |
| Surface Hole Longitude: -115.822866 |
| Date | Event |
|---|---|
| 1990-01-10 | Obtained License |
| 1990-02-18 | Lost Circulation Occurred |
| 1990-02-19 | Surface Casing Operation Performed |
| 1990-04-02 | Well Log Performed |
| 1990-04-05 | Well Log Performed |
| 1990-04-08 | Intermediate Casing Operation Performed |
| 1990-04-09 | Well Log Performed |
| 1990-04-14 | Finished Drilling |
| 1990-04-14 | Well Mode changed to Drilled and Cased |
| 1990-04-16 | Well Log Performed |
| 1990-04-17 | Liner Casing Operation Performed |
| 1990-04-18 | Rig Released |
| 1990-06-24 | Well Log Performed |
| 1990-06-25 | Perforation Treatment Performed - Jet Perforation |
| 1990-06-25 | Well Log Performed |
| 1990-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-09-07 | Well Began Injection |
| 1990-09-07 | Well Fluid changed to Water |
| 1990-09-07 | Well Type changed to Injection |
| 1993-10-06 | Well Log Performed |
| 1993-10-08 | Perforation Treatment Performed - Cement Squeeze |
| 1993-10-12 | Perforation Treatment Performed - Jet Perforation |
| 1993-10-12 | Well Log Performed |
| 1993-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1993-11-01 | Well Began Production |
| 1993-11-01 | Well Fluid changed to Crude Oil |
| 1993-11-01 | Well Mode changed to Flowing |
| 1996-07-06 | Perforation Treatment Performed - Cement Squeeze |
| 1996-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1996-07-11 | Perforation Treatment Performed - Jet Perforation |
| 1996-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1996-07-15 | Perforation Treatment Performed - Jet Perforation |
| 1996-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-05-08 | Well Log Performed |
| 1998-07-12 | Well Log Performed |
| 1998-07-22 | Well Log Performed |
| 1998-07-23 | Well Log Performed |
| 1998-07-27 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-06-25 | Perforation | 3300.00 | 3305.00 | 13 |
| 1996-07-15 | Perforation | 3275.50 | 3277.50 | 20 |
| 1996-07-16 | Acid Treatment | 3275.50 | 3277.50 | 0 |
| 1990-06-26 | Acid Treatment | 3300.00 | 3305.00 | 0 |
| 1993-10-08 | Cement Squeeze | 3300.00 | 3305.00 | 0 |
| 1993-10-12 | Perforation | 3275.00 | 3280.00 | 13 |
| 1993-10-13 | Acid Treatment | 3275.00 | 3280.00 | 0 |
| 1996-07-06 | Cement Squeeze | 3275.00 | 3280.00 | 0 |
| 1996-07-11 | Perforation | 3285.50 | 3286.50 | 20 |
| 1996-07-11 | Acid Treatment | 3285.50 | 3286.50 | 0 |
| 1996-07-12 | Packing Device Capped w/Cement | 3284.00 | 3285.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 0 | 0.0 | 0.0 | 0.0 |
| 1991 | 0 | 0.0 | 0.0 | 0.0 |
| 1992 | 0 | 0.0 | 0.0 | 0.0 |
| 1993 | 1199 | 0.0 | 0.0 | 0.0 |
| 1994 | 7800 | 0.0 | 0.0 | 0.0 |
| 1995 | 8233 | 0.0 | 0.0 | 0.0 |
| 1996 | 7713 | 0.0 | 0.0 | 0.0 |
| 1997 | 6473 | 0.0 | 0.0 | 0.0 |
| 1998 | 7186 | 0.0 | 0.0 | 0.0 |
| 1999 | 5502 | 0.0 | 0.0 | 0.0 |
| 2000 | 6034 | 0.0 | 0.0 | 0.0 |
| 2001 | 6567 | 0.0 | 0.0 | 0.0 |
| 2002 | 8455 | 0.0 | 0.0 | 0.0 |
| 2003 | 7620 | 0.0 | 0.0 | 0.0 |
| 2004 | 7921 | 0.0 | 0.0 | 0.0 |
| 2005 | 7788 | 0.0 | 0.0 | 0.0 |
| 2006 | 7843 | 0.0 | 0.0 | 0.0 |
| 2007 | 7504 | 0.0 | 0.0 | 0.0 |
| 2008 | 8107 | 0.0 | 0.0 | 0.0 |
| 2009 | 7689 | 0.0 | 0.0 | 0.0 |
| 2010 | 8116 | 0.0 | 0.0 | 0.0 |
| 2011 | 7723 | 0.0 | 0.0 | 0.0 |
| 2012 | 5713 | 0.0 | 0.0 | 0.0 |
| 2013 | 5456 | 0.0 | 0.0 | 0.0 |
| 2014 | 7741 | 0.0 | 0.0 | 0.0 |
| 2015 | 7321 | 0.0 | 0.0 | 0.0 |
| 2016 | 6185 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1990-02-18 | Lost Circulation | 262.00 | 262.00 |
For data sources see[6]