X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485160511002

Well Details

Well ID: 0485160511002
Loading map...
Location: 00/11-05-048-16W5/2
Location Alias: 00/11-05-48-16 W5M
Location Alias 2: 00/11-05-048-16 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 05
County/Municipality: Yellowhead County
Well Name: BOULDER PECO 11-5-48-16
Operator Name: Boulder Energy Ltd.
License Number: 0216610
License Date: 1998-07-22
License Status: Suspension
Spud Date: 1998-08-12
Final Drill Date: 1998-09-12
Well Total Depth: 3185.00 m
Surface Hole Latitude: 53.114460
Surface Hole Longitude: -116.310609

For data sources see[1][2]

Well History

Date Event
1998-07-22 Obtained License
1998-08-12 Well Log Performed
1998-08-16 Surface Casing Operation Performed
1998-08-28 Kick Occurred
1998-09-02 Lost Circulation Occurred
1998-09-12 Finished Drilling
1998-09-12 Well Log Performed
1998-09-12 Well Mode changed to Drilled and Cased
1998-09-13 Well Log Performed
1998-09-16 Production Casing Operation Performed
1998-09-17 Rig Released
1998-10-05 Well Log Performed
1998-10-07 Well Log Performed
1998-10-08 Perforation Treatment Performed - Jet Perforation
1998-10-08 Well Log Performed
1998-10-10 Perforation Treatment Performed - Fractured
1998-10-14 Well Log Performed
1998-10-21 Perforation Treatment Performed - Fractured
1998-11-16 Well Log Performed
1998-11-26 Well Log Performed
1998-12-03 Well Log Performed
1998-12-05 Perforation Treatment Performed - Jet Perforation
1998-12-06 Well Log Performed
1998-12-07 Perforation Treatment Performed - Cement Squeeze
1998-12-07 Well Log Performed
1998-12-08 Perforation Treatment Performed - Jet Perforation
1998-12-09 Perforation Treatment Performed - Cement Squeeze
1998-12-18 Well Log Performed
1998-12-19 Well Log Performed
1998-12-20 Perforation Treatment Performed - Jet Perforation
1998-12-30 Perforation Treatment Performed - Cement Squeeze
1999-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-21 Perforation Treatment Performed - Jet Perforation
1999-10-21 Plug Back Performed
1999-10-21 Well Log Performed
1999-10-23 Perforation Treatment Performed - Jet Perforation
1999-10-23 Well Log Performed
1999-10-24 Perforation Treatment Performed - Jet Perforation
1999-10-24 Well Log Performed
1999-10-25 Perforation Treatment Performed - Remedial Casing
1999-10-30 Well Log Performed
1999-10-31 Perforation Treatment Performed - Jet Perforation
1999-10-31 Well Log Performed
1999-11-02 Perforation Treatment Performed - Fractured
1999-12-01 Well Began Production
1999-12-01 Well Fluid changed to Crude Oil
1999-12-01 Well Mode changed to Pumping
2009-02-21 Perforation Treatment Performed - Jet Perforation
2009-02-23 Perforation Treatment Performed - Fractured
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-08 Perforation 3162.00 3165.00 3
1999-10-21 Packing Device Capped w/Cement 3147.00 3155.00 0
1999-10-21 Perforation 2040.00 2041.00 13
1999-10-21 Perforation 2159.00 2160.00 13
1999-10-23 Perforation 2114.00 2115.00 13
1999-10-24 Perforation 2080.00 2081.00 13
1999-10-25 Remedial Casing Cementing 2040.00 2160.00 0
1999-10-31 Perforation 2095.00 2100.00 3
1999-11-02 Fracture 2095.00 2100.00 0
2009-02-21 Perforation 1944.00 1947.00 17
2009-02-21 Perforation 1934.00 1941.00 17
1998-10-10 Fracture 3162.00 3165.00 0
2009-02-23 Fracture 1944.00 1947.00 0
2009-02-23 Fracture 1934.00 1941.00 0
1998-10-21 Fracture 3162.00 3165.00 0
1998-12-05 Perforation 2577.00 2577.30 24
1998-12-07 Cement Squeeze 2577.00 2577.30 0
1998-12-08 Perforation 2560.00 2560.30 24
1998-12-09 Cement Squeeze 2560.00 2560.30 0
1998-12-20 Perforation 2570.50 2572.50 7
1998-12-30 Cement Squeeze 2570.50 2572.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 625 0.0 0.0 0.0
2000 8527 0.0 0.0 0.0
2001 5655 0.0 0.0 0.0
2002 8021 0.0 0.0 0.0
2003 6546 0.0 0.0 0.0
2004 6780 0.0 0.0 0.0
2005 3094 0.0 0.0 0.0
2009 5220 0.0 0.0 0.0
2010 23 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-08-28 Kick 2574.90 2576.00
1998-09-02 Lost Circulation 2812.00 2829.00

For data sources see[6]

References