X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494010505020

Well Details

Well ID: 0494010505020
Loading map...
Location: 02/05-05-049-01W4/0
Location Alias: 02/05-05-49-01 W4M
Location Alias 2: 02/05-05-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 05
County/Municipality: County of Vermilion River
Well Name: CREW DD 102 LLOYD 5-5-49-1
Operator Name: Crew Energy Inc.
License Number: 0458048
License Date: 2013-07-16
License Status: Suspension
Spud Date: 2013-07-31
Final Drill Date: 2013-08-01
Well Total Depth: 728.00 m
Surface Hole Latitude: 53.196966
Surface Hole Longitude: -110.123680

For data sources see[1][2]

Well History

Date Event
2013-07-16 Obtained License
2013-07-31 Surface Casing Operation Performed
2013-08-01 Direction Drilling Operation Performed - Deviate
2013-08-01 Finished Drilling
2013-08-01 Well Mode changed to Drilled and Cased
2013-08-02 Production Casing Operation Performed
2013-08-02 Rig Released
2013-08-02 Well Log Performed
2013-08-27 Perforation Treatment Performed - Jet Perforation
2013-09-03 Well Began Production
2013-09-03 Well Fluid changed to Crude Oil
2013-09-03 Well Mode changed to Pumping
2015-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-19 Plug Back Performed
2015-02-19 Well Fluid changed to Crude Oil
2015-02-19 Well Mode changed to Abandoned Zone
2015-02-20 Perforation Treatment Performed - Jet Perforation
2015-02-20 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-31 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-01 152.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-27 Perforation 664.00 667.00 17
2015-02-19 Packing Device Capped w/Cement 654.50 662.50 0
2015-02-20 Perforation 540.00 543.00 26

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2760 0.0 0.0 0.0
2014 8356 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-02 No Incident Encountered 0.00 0.00
2013-08-28 No Incident Encountered 0.00 0.00
2015-02-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References