If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494013208A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.268012,"lon":-110.10471,"icon":""}]} |
Location: A0/08-32-049-01W4/0 | |
Location Alias: A0/08-32-49-01 W4M | |
Location Alias 2: A0/08-32-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 32 | |
County/Municipality: County of Vermilion River | |
Well Name: SPARKY #1 | |
Operator Name: Shaw Petroleums Ltd. (R.L. Shaw) 167 | |
License Number: B0000443 | |
License Date: 1943-06-12 | |
License Status: RecExempt | |
Spud Date: 1943-06-19 | |
Final Drill Date: 1943-07-13 | |
Well Total Depth: 614.20 m | |
Surface Hole Latitude: 53.268012 | |
Surface Hole Longitude: -110.104710 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1943-06-12 | Obtained License |
1943-07-13 | Finished Drilling |
1943-07-13 | Well Mode changed to Drilled and Cased |
1943-07-16 | Liner Casing Operation Performed |
1943-07-16 | Perforation Treatment Performed - Open-Hole Completion |
1943-08-01 | Perforation Treatment Performed - Selective Bullet Perforations |
1943-08-16 | Well Began Production |
1943-08-16 | Well Fluid changed to Crude Oil |
1943-08-16 | Well Mode changed to Pumping |
1943-12-28 | Well Fluid changed to Crude Oil |
1943-12-28 | Well Mode changed to Suspended |
1944-02-17 | Perforation Treatment Performed - Cement Squeeze |
1944-04-20 | Perforation Treatment Performed - Bullet Perforation |
1944-05-08 | Well Fluid changed to Crude Oil |
1944-05-08 | Well Mode changed to Pumping |
1944-11-17 | Perforation Treatment Performed - Bullet Perforation |
1944-11-27 | Perforation Treatment Performed - Bullet Perforation |
1944-11-28 | Perforation Treatment Performed - Bullet Perforation |
1947-12-29 | Well Fluid changed to Crude Oil |
1947-12-29 | Well Mode changed to Suspended |
1952-07-30 | Perforation Treatment Performed - Cement Plug |
1952-07-30 | Well Abandoned |
1952-07-30 | Well Fluid changed to Crude Oil |
1952-07-30 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1943-07-16 | Open Hole/Barefoot Completion | 601.70 | 606.20 | 0 |
1943-08-01 | Selective Bullet Perforations | 604.40 | 605.00 | 0 |
1943-08-01 | Selective Bullet Perforations | 602.00 | 604.10 | 0 |
1944-02-17 | Cement Squeeze | 602.00 | 605.00 | 0 |
1944-04-20 | Bullet Perforation | 602.60 | 602.90 | 0 |
1944-11-17 | Bullet Perforation | 602.60 | 603.50 | 26 |
1944-11-27 | Bullet Perforation | 601.10 | 602.60 | 16 |
1944-11-28 | Bullet Perforation | 601.10 | 602.60 | 16 |
1952-07-30 | Cement Plug | 497.70 | 603.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]