If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494190409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.201532,"lon":-112.713623,"icon":""}]} |
Location: 00/09-04-049-19W4/0 | |
Location Alias: 00/09-04-49-19 W4M | |
Location Alias 2: 00/09-04-049-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 19 | |
Section: 04 | |
County/Municipality: Camrose County | |
Well Name: CALPINE KINGMAN 9-4-49-19 | |
Operator Name: Calpine Canada Resources Company | |
License Number: 0144445 | |
License Date: 1990-06-14 | |
License Status: RecCertified | |
Spud Date: 1990-06-21 | |
Final Drill Date: 1990-06-24 | |
Well Total Depth: 1112.00 m | |
Surface Hole Latitude: 53.201532 | |
Surface Hole Longitude: -112.713623 |
Date | Event |
---|---|
1990-06-14 | Obtained License |
1990-06-21 | Surface Casing Operation Performed |
1990-06-24 | Finished Drilling |
1990-06-24 | Well Log Performed |
1990-06-25 | Drill Stem Test Performed |
1990-06-26 | Drill Stem Test Performed |
1990-06-27 | Production Casing Operation Performed |
1990-06-27 | Rig Released |
1990-08-20 | Perforation Treatment Performed - Jet Perforation |
1990-08-20 | Well Log Performed |
1990-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-08-21 | Perforation Treatment Performed - Jet Perforation |
1990-08-21 | Plug Back Performed |
1990-08-21 | Well Log Performed |
1991-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-05-25 | Plug Back Performed |
1991-05-25 | Well Mode changed to Abandoned |
1991-05-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-08-20 | Perforation | 1086.00 | 1087.00 | 13 |
1990-08-21 | Packing Device Capped w/Cement | 1069.00 | 1077.00 | 0 |
1990-08-21 | Perforation | 993.20 | 994.70 | 13 |
1991-05-25 | Packing Device Capped w/Cement | 981.00 | 989.00 | 0 |
For data sources see[4]