If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494191714003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.233037,"lon":-112.750657,"icon":""}]} |
Location: 00/14-17-049-19W4/3 | |
Location Alias: 00/14-17-49-19 W4M | |
Location Alias 2: 00/14-17-049-19 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 19 | |
Section: 17 | |
County/Municipality: Camrose County | |
Well Name: CALPINE KINGMAN 14-17-49-19 | |
Operator Name: Calpine Canada Resources Company | |
License Number: 0092464 | |
License Date: 1981-09-29 | |
License Status: RecCertified | |
Spud Date: 1981-09-28 | |
Final Drill Date: 1981-10-03 | |
Well Total Depth: 1149.00 m | |
Surface Hole Latitude: 53.233037 | |
Surface Hole Longitude: -112.750657 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-09-29 | Obtained License |
1981-10-01 | Drill Stem Test Performed |
1981-10-03 | Drill Stem Test Performed |
1981-10-03 | Finished Drilling |
1981-10-04 | Drill Stem Test Performed |
1981-10-05 | Production Casing Operation Performed |
1982-02-13 | Perforation Treatment Performed - Jet Perforation |
1982-02-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-02-16 | Perforation Treatment Performed - Jet Perforation |
1982-02-17 | Perforation Treatment Performed - Jet Perforation |
1982-02-20 | Well Mode changed to Drilled and Cased |
1982-10-30 | Well Began Production |
1982-10-30 | Well Fluid changed to Gas |
1982-10-30 | Well Mode changed to Flowing |
1983-01-25 | Well Fluid changed to Gas |
1983-01-25 | Well Mode changed to Suspended |
1983-02-03 | Well Fluid changed to Gas |
1983-02-03 | Well Mode changed to Flowing |
1985-12-05 | Well Fluid changed to Gas |
1985-12-05 | Well Mode changed to Suspended |
1985-12-16 | Perforation Treatment Performed - Jet Perforation |
1985-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-12-17 | Plug Back Performed |
1985-12-17 | Well Fluid changed to Gas |
1985-12-17 | Well Mode changed to Suspended |
1992-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-09-02 | Plug Back Performed |
1992-09-02 | Well Fluid changed to Gas |
1992-09-02 | Well Log Performed |
1992-09-02 | Well Mode changed to Abandoned |
1992-09-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-02-13 | Perforation | 1120.50 | 1122.50 | 7 |
1982-02-13 | Perforation | 1125.50 | 1128.50 | 7 |
1982-02-14 | Acid Treatment | 1120.50 | 1128.50 | 0 |
1982-02-16 | Perforation | 1045.50 | 1047.50 | 7 |
1982-02-17 | Perforation | 895.50 | 897.00 | 10 |
1985-12-16 | Perforation | 1045.50 | 1048.00 | 14 |
1985-12-17 | Packing Device Capped w/Cement | 1032.00 | 1040.00 | 0 |
1992-09-02 | Packing Device Capped w/Cement | 881.00 | 889.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 1376 | 0.0 | 0.0 | 0.0 |
1983 | 4661 | 0.0 | 0.0 | 0.0 |
1984 | 288 | 0.0 | 0.0 | 0.0 |
1985 | 3290 | 0.0 | 0.0 | 0.0 |
For data sources see[5]