If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494201107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.21194,"lon":-112.815807,"icon":""}]} |
Location: 00/07-11-049-20W4/0 | |
Location Alias: 00/07-11-49-20 W4M | |
Location Alias 2: 00/07-11-049-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 20 | |
Section: 11 | |
County/Municipality: Camrose County | |
Well Name: DEML JOARCAM 7-11-49-20 | |
Operator Name: Direct Energy Marketing Limited | |
License Number: 0104300 | |
License Date: 1983-11-24 | |
License Status: RecCertified | |
Spud Date: 1983-12-06 | |
Final Drill Date: 1983-12-12 | |
Well Total Depth: 1223.00 m | |
Surface Hole Latitude: 53.211940 | |
Surface Hole Longitude: -112.815807 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-11-24 | Obtained License |
1983-12-11 | Well Log Performed |
1983-12-12 | Finished Drilling |
1983-12-13 | Drill Stem Test Performed |
1983-12-14 | Drill Stem Test Performed |
1983-12-15 | Production Casing Operation Performed |
1983-12-16 | Well Mode changed to Drilled and Cased |
1985-02-07 | Perforation Treatment Performed - Jet Perforation |
1985-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-02-13 | Perforation Treatment Performed - Jet Perforation |
1990-12-26 | Well Began Production |
1990-12-26 | Well Fluid changed to Gas |
1990-12-26 | Well Mode changed to Flowing |
1993-05-01 | Well Fluid changed to Gas |
1993-05-01 | Well Mode changed to Suspended |
1993-05-21 | Well Log Performed |
1993-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-05-25 | Plug Back Performed |
1993-05-25 | Well Fluid changed to Gas |
1993-05-25 | Well Log Performed |
1993-05-25 | Well Mode changed to Abandoned Zone |
1993-05-26 | Perforation Treatment Performed - Jet Perforation |
1996-02-29 | Well Log Performed |
1996-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-01 | Plug Back Performed |
1996-03-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-02-07 | Perforation | 1177.00 | 1178.00 | 13 |
1985-02-13 | Packing Device Capped w/Cement | 1160.00 | 1173.00 | 0 |
1985-02-13 | Perforation | 1134.00 | 1136.00 | 7 |
1993-05-25 | Packing Device Capped w/Cement | 1122.00 | 1130.00 | 0 |
1993-05-26 | Perforation | 1093.00 | 1094.00 | 13 |
1996-03-01 | Packing Device Capped w/Cement | 1080.00 | 1088.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 144 | 0.0 | 0.0 | 0.0 |
1991 | 6601 | 0.0 | 0.0 | 0.0 |
1992 | 1421 | 0.0 | 0.0 | 0.0 |
For data sources see[5]