If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494210305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.197952,"lon":-112.997873,"icon":""}]} |
Location: 00/05-03-049-21W4/0 | |
Location Alias: 00/05-03-49-21 W4M | |
Location Alias 2: 00/05-03-049-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 21 | |
Section: 03 | |
County/Municipality: Camrose County | |
Well Name: CABRE ET AL JOARCAM 5-3-49-21 | |
Operator Name: Enerplus Corporation | |
License Number: 0005413 | |
License Date: 1952-10-03 | |
License Status: Suspension | |
Spud Date: 1952-11-20 | |
Final Drill Date: 1952-11-28 | |
Well Total Depth: 1015.00 m | |
Surface Hole Latitude: 53.197952 | |
Surface Hole Longitude: -112.997873 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-10-03 | Obtained License |
1952-11-28 | Drill Stem Test Performed |
1952-11-28 | Finished Drilling |
1952-11-28 | Production Casing Operation Performed |
1952-11-28 | Well Mode changed to Drilled and Cased |
1952-12-10 | Perforation Treatment Performed - Bullet Perforation |
1952-12-18 | Well Began Production |
1952-12-18 | Well Fluid changed to Crude Oil |
1952-12-18 | Well Mode changed to Pumping |
1953-11-10 | Perforation Treatment Performed - Jet Perforation |
1954-05-10 | Perforation Treatment Performed - Jet Perforation |
1954-05-11 | Perforation Treatment Performed - Cement Squeeze |
1954-05-19 | Perforation Treatment Performed - Cement Squeeze |
1954-05-22 | Perforation Treatment Performed - Jet Perforation |
1954-07-14 | Perforation Treatment Performed - Cement Squeeze |
1954-07-17 | Perforation Treatment Performed - Jet Perforation |
1955-02-10 | Perforation Treatment Performed - Cement Squeeze |
1955-02-14 | Perforation Treatment Performed - Jet Perforation |
1981-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-01-21 | Perforation Treatment Performed - Cement Squeeze |
1981-01-24 | Perforation Treatment Performed - Jet Perforation |
1981-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-07-18 | Well Log Performed |
1997-11-05 | Perforation Treatment Performed - Cement Squeeze |
1997-11-07 | Perforation Treatment Performed - Jet Perforation |
1997-11-07 | Well Log Performed |
2010-01-22 | Well Fluid changed to Crude Oil |
2010-01-22 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-10 | Bullet Perforation | 997.90 | 998.50 | 20 |
1955-02-14 | Perforation | 999.70 | 1001.00 | 13 |
1981-01-20 | Acid Treatment | 999.70 | 1001.00 | 0 |
1981-01-21 | Cement Squeeze | 999.70 | 1001.00 | 0 |
1981-01-24 | Perforation | 1000.00 | 1000.60 | 7 |
1981-01-25 | Acid Treatment | 1000.00 | 1006.00 | 0 |
1997-11-05 | Cement Squeeze | 1000.00 | 1006.60 | 0 |
1997-11-07 | Perforation | 998.00 | 999.50 | 13 |
1953-11-10 | Perforation | 998.80 | 999.70 | 13 |
1954-05-10 | Perforation | 996.70 | 997.00 | 39 |
1954-05-11 | Cement Squeeze | 996.70 | 997.00 | 0 |
1954-05-19 | Cement Squeeze | 997.90 | 999.70 | 0 |
1954-05-22 | Perforation | 998.80 | 1000.40 | 13 |
1954-07-14 | Cement Squeeze | 998.80 | 1000.40 | 0 |
1954-07-17 | Perforation | 998.80 | 1000.40 | 13 |
1955-02-10 | Cement Squeeze | 998.80 | 1000.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 1152 | 0.0 | 0.0 | 0.0 |
1973 | 1992 | 0.0 | 0.0 | 0.0 |
1974 | 5040 | 0.0 | 0.0 | 0.0 |
1975 | 5099 | 0.0 | 0.0 | 0.0 |
1976 | 3312 | 0.0 | 0.0 | 0.0 |
1977 | 356 | 0.0 | 0.0 | 0.0 |
1981 | 26 | 0.0 | 0.0 | 0.0 |
1983 | 1019 | 0.0 | 0.0 | 0.0 |
1984 | 8398 | 0.0 | 0.0 | 0.0 |
1985 | 8314 | 0.0 | 0.0 | 0.0 |
1986 | 7996 | 0.0 | 0.0 | 0.0 |
1987 | 8443 | 0.0 | 0.0 | 0.0 |
1988 | 8590 | 0.0 | 0.0 | 0.0 |
1989 | 8513 | 0.0 | 0.0 | 0.0 |
1990 | 8620 | 0.0 | 0.0 | 0.0 |
1991 | 8596 | 0.0 | 0.0 | 0.0 |
1992 | 8577 | 0.0 | 0.0 | 0.0 |
1993 | 7573 | 0.0 | 0.0 | 0.0 |
1994 | 8378 | 0.0 | 0.0 | 0.0 |
1995 | 8690 | 0.0 | 0.0 | 0.0 |
1996 | 8355 | 0.0 | 0.0 | 0.0 |
1997 | 8391 | 0.0 | 0.0 | 0.0 |
1998 | 8533 | 0.0 | 0.0 | 0.0 |
1999 | 8588 | 0.0 | 0.0 | 0.0 |
2000 | 8345 | 0.0 | 0.0 | 0.0 |
2001 | 8665 | 0.0 | 0.0 | 0.0 |
2002 | 8743 | 0.0 | 0.0 | 0.0 |
2003 | 8557 | 0.0 | 0.0 | 0.0 |
2004 | 8306 | 0.0 | 0.0 | 0.0 |
2005 | 8500 | 0.0 | 0.0 | 0.0 |
2006 | 8755 | 0.0 | 0.0 | 0.0 |
2007 | 8740 | 0.0 | 0.0 | 0.0 |
2008 | 7767 | 0.0 | 0.0 | 0.0 |
2009 | 8256 | 0.0 | 0.0 | 0.0 |
2010 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]