X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494210814000

Well Details

Well ID: 0494210814000
Loading map...
Location: 00/14-08-049-21W4/0
Location Alias: 00/14-08-49-21 W4M
Location Alias 2: 00/14-08-049-21 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 21
Section: 08
County/Municipality: Camrose County
Well Name: IMP ET AL JOAM 14-8V-49-21
Operator Name: Enerplus Corporation
License Number: 0008485
License Date: 1954-09-16
License Status: RecExempt
Spud Date: 1954-11-01
Final Drill Date: 1954-11-06
Well Total Depth: 1013.50 m
Surface Hole Latitude: 53.220185
Surface Hole Longitude: -113.039674

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-09-16 Obtained License
1954-11-06 Drill Stem Test Performed
1954-11-06 Finished Drilling
1954-11-06 Well Mode changed to Drilled and Cased
1954-11-07 Drill Stem Test Performed
1954-11-08 Production Casing Operation Performed
1954-11-26 Perforation Treatment Performed - Jet Perforation
1954-12-29 Perforation Treatment Performed - Jet Perforation
1954-12-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-01-05 Well Began Production
1955-01-05 Well Fluid changed to Crude Oil
1955-01-05 Well Mode changed to Pumping
1956-06-04 Perforation Treatment Performed - Cement Squeeze
1956-06-06 Perforation Treatment Performed - Bullet Perforation
1956-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-16 Perforation Treatment Performed - Cement Plug
1960-05-17 Well Abandoned
1960-05-17 Well Fluid changed to Crude Oil
1960-05-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-26 Perforation 995.80 996.10 13
1954-12-29 Perforation 995.50 996.10 20
1954-12-30 Acid Treatment 995.50 996.10 0
1956-06-04 Cement Squeeze 995.50 996.10 0
1956-06-06 Bullet Perforation 988.20 989.40 13
1956-06-12 Acid Treatment 988.20 989.40 0
1960-05-16 Cement Plug 957.70 1003.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References