If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0494252004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.237814,"lon":-113.631585,"icon":""}]} |
| Location: 00/04-20-049-25W4/0 | |
| Location Alias: 00/04-20-49-25 W4M | |
| Location Alias 2: 00/04-20-049-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 20 | |
| County/Municipality: Leduc County | |
| Well Name: SKYLINE, NEW DEVON, BANNER NO. 4-20 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0005074 | |
| License Date: 1952-07-28 | |
| License Status: RecCertified | |
| Spud Date: 1952-07-26 | |
| Final Drill Date: 1952-08-14 | |
| Well Total Depth: 1594.10 m | |
| Surface Hole Latitude: 53.237814 | |
| Surface Hole Longitude: -113.631585 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-07-28 | Obtained License |
| 1952-08-12 | Drill Stem Test Performed |
| 1952-08-14 | Drill Stem Test Performed |
| 1952-08-14 | Finished Drilling |
| 1952-08-14 | Well Mode changed to Drilled and Cased |
| 1952-08-16 | Production Casing Operation Performed |
| 1952-08-20 | Perforation Treatment Performed - Jet Perforation |
| 1952-08-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1952-08-28 | Well Began Production |
| 1952-08-28 | Well Fluid changed to Crude Oil |
| 1952-08-28 | Well Mode changed to Flowing |
| 1958-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-08-12 | Perforation Treatment Performed - Cement Squeeze |
| 1959-09-05 | Perforation Treatment Performed - Jet Perforation |
| 1959-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-09-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-09-12 | Well Fluid changed to Crude Oil |
| 1959-09-12 | Well Mode changed to Pumping |
| 1960-03-17 | Well Fluid changed to Crude Oil |
| 1960-03-17 | Well Mode changed to Suspended |
| 1961-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1961-03-15 | Well Fluid changed to Crude Oil |
| 1961-03-15 | Well Mode changed to Pumping |
| 1962-07-07 | Perforation Treatment Performed - Bullet Perforation |
| 1962-07-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1962-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1965-07-15 | Well Fluid changed to Crude Oil |
| 1965-07-15 | Well Mode changed to Suspended |
| 1968-01-17 | Perforation Treatment Performed - Cement Plug |
| 1968-01-25 | Well Abandoned |
| 1968-01-25 | Well Fluid changed to Crude Oil |
| 1968-01-25 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-08-20 | Perforation | 1563.30 | 1565.50 | 13 |
| 1959-09-05 | Perforation | 1577.90 | 1578.90 | 7 |
| 1959-09-05 | Perforation | 1579.80 | 1580.70 | 7 |
| 1959-09-05 | Perforation | 1582.20 | 1583.40 | 7 |
| 1959-09-05 | Perforation | 1584.70 | 1585.60 | 7 |
| 1959-09-06 | Acid Treatment | 1571.20 | 1585.60 | 0 |
| 1959-09-11 | Acid Treatment | 1571.20 | 1585.60 | 0 |
| 1961-03-15 | Acid Treatment | 1571.20 | 1585.60 | 0 |
| 1962-07-07 | Bullet Perforation | 1579.20 | 1581.30 | 7 |
| 1962-07-08 | Acid Treatment | 1579.20 | 1581.30 | 0 |
| 1962-07-09 | Acid Treatment | 1579.20 | 1581.30 | 0 |
| 1952-08-20 | Perforation | 1569.40 | 1572.50 | 13 |
| 1968-01-17 | Cement Plug | 1539.20 | 1587.40 | 0 |
| 1952-08-20 | Perforation | 1576.70 | 1578.60 | 13 |
| 1952-08-20 | Perforation | 1581.90 | 1585.00 | 13 |
| 1952-08-21 | Acid Treatment | 1563.30 | 1585.00 | 0 |
| 1958-07-28 | Acid Treatment | 1563.30 | 1585.00 | 0 |
| 1959-08-12 | Cement Squeeze | 1563.30 | 1585.00 | 0 |
| 1959-09-05 | Perforation | 1571.20 | 1572.20 | 7 |
| 1959-09-05 | Perforation | 1572.80 | 1573.70 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]