X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494252113000

Well Details

Well ID: 0494252113000
Loading map...
Location: 00/13-21-049-25W4/0
Location Alias: 00/13-21-49-25 W4M
Location Alias 2: 00/13-21-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 21
County/Municipality: Leduc
Well Name: SINOWEST LEDUC-WB 13-21-49-25
Operator Name: Sino-Western Petroleum, Inc.
License Number: 0007814
License Date: 1954-03-16
License Status: Abandoned
Spud Date: 1954-03-19
Final Drill Date: 1954-03-30
Well Total Depth: 1607.80 m
Surface Hole Latitude: 53.248690
Surface Hole Longitude: -113.607254

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-03-16 Obtained License
1954-03-29 Drill Stem Test Performed
1954-03-30 Finished Drilling
1954-03-30 Production Casing Operation Performed
1954-03-30 Well Mode changed to Drilled and Cased
1954-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-04-02 Perforation Treatment Performed - Bullet Perforation
1954-04-04 Perforation Treatment Performed - Cement Squeeze
1954-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-04-05 Perforation Treatment Performed - Bullet Perforation
1954-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-04-06 Perforation Treatment Performed - Bullet Perforation
1954-04-13 Well Began Production
1954-04-13 Well Fluid changed to Crude Oil
1954-04-13 Well Mode changed to Pumping
1958-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-22 Well Fluid changed to Crude Oil
1980-08-22 Well Mode changed to Suspended
1981-01-16 Well Fluid changed to Crude Oil
1981-01-16 Well Mode changed to Pumping
1985-02-05 Perforation Treatment Performed - Jet Perforation
1985-02-05 Well Log Performed
1985-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-07 Perforation Treatment Performed - Jet Perforation
1985-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-08 Perforation Treatment Performed - Fractured
2008-08-01 Well Fluid changed to Crude Oil
2008-08-01 Well Mode changed to Suspended
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Pumping
2019-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-26 Perforation Treatment Performed - Jet Perforation
2019-10-26 Plug Back Performed
2019-10-26 Well Fluid changed to Crude Oil
2019-10-26 Well Log Performed
2019-10-26 Well Mode changed to Abandoned Zone
2019-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-27 Perforation Treatment Performed - Cement Plug
2019-10-27 Perforation Treatment Performed - Cement Squeeze
2019-10-27 Plug Back Performed
2019-11-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-04-02 Bullet Perforation 1574.90 1577.30 13
1954-04-06 Acid Treatment 1558.40 1562.40 0
1954-04-06 Acid Treatment 1553.30 1554.50 0
1958-02-12 Acid Treatment 1570.00 1573.10 0
1958-02-12 Acid Treatment 1561.50 1562.40 0
1958-02-12 Acid Treatment 1558.40 1559.10 0
1958-02-12 Acid Treatment 1553.30 1554.50 0
1985-02-05 Perforation 1544.30 1545.90 13
1985-02-06 Acid Treatment 1544.30 1545.90 0
1985-02-07 Perforation 1544.30 1545.90 13
1985-02-08 Acid Treatment 1544.30 1545.90 0
1954-04-02 Acid Treatment 1574.90 1577.30 0
1985-03-08 Fracture 1544.30 1545.90 0
2019-10-26 Packing Device Capped w/Cement 1524.80 1533.00 0
2019-10-26 Perforation 619.00 620.00 13
2019-10-26 Perforation 336.00 337.00 13
2019-10-26 Perforation 196.00 197.00 13
2019-10-26 Perforation 154.00 155.00 13
2019-10-27 Cement Squeeze 619.00 620.00 0
2019-10-27 Packing Device Capped w/Cement 604.30 614.00 0
2019-10-27 Cement Plug 104.10 352.00 0
1954-04-04 Cement Squeeze 1574.90 1577.30 0
1954-04-05 Bullet Perforation 1570.00 1573.10 13
1954-04-05 Acid Treatment 1570.00 1573.10 0
1954-04-06 Bullet Perforation 1553.30 1554.50 13
1954-04-06 Bullet Perforation 1558.40 1559.10 13
1954-04-06 Bullet Perforation 1561.50 1562.40 13
1954-04-06 Bullet Perforation 1563.00 1563.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7460 0.0 0.0 0.0
1968 7332 0.0 0.0 0.0
1969 7776 0.0 0.0 0.0
1970 8052 0.0 0.0 0.0
1971 8181 0.0 0.0 0.0
1972 7185 0.0 0.0 0.0
1973 7552 0.0 0.0 0.0
1974 6636 0.0 0.0 0.0
1975 5974 0.0 0.0 0.0
1976 7704 0.0 0.0 0.0
1977 8399 0.0 0.0 0.0
1978 6130 0.0 0.0 0.0
1981 6118 0.0 0.0 0.0
1982 4182 0.0 0.0 0.0
1983 7593 0.0 0.0 0.0
1984 7979 0.0 0.0 0.0
1985 7648 0.0 0.0 0.0
1986 5269 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8577 0.0 0.0 0.0
1989 8400 0.0 0.0 0.0
1990 8673 0.0 0.0 0.0
1991 8543 0.0 0.0 0.0
1992 8645 0.0 0.0 0.0
1993 8177 0.0 0.0 0.0
1994 8216 0.0 0.0 0.0
1995 8541 0.0 0.0 0.0
1996 8224 0.0 0.0 0.0
1997 8543 0.0 0.0 0.0
1998 8412 0.0 0.0 0.0
1999 8336 0.0 0.0 0.0
2000 8480 0.0 0.0 0.0
2001 6722 0.0 0.0 0.0
2002 5796 0.0 0.0 0.0
2003 7524 0.0 0.0 0.0
2004 7148 0.0 0.0 0.0
2005 8460 0.0 0.0 0.0
2006 8579 0.0 0.0 0.0
2007 8210 0.0 0.0 0.0
2008 813 0.0 0.0 0.0
2014 840 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References