X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494252906023

Well Details

Well ID: 0494252906023
Loading map...
Location: 02/06-29-049-25W4/3
Location Alias: 02/06-29-49-25 W4M
Location Alias 2: 02/06-29-049-25 W4/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 29
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 6-29-49-25
Operator Name: NEP Canada ULC
License Number: 0055171
License Date: 1975-10-01
License Status: Abandoned
Spud Date: 1975-10-08
Final Drill Date: 1975-10-30
Well Total Depth: 1661.20 m
Surface Hole Latitude: 53.256998
Surface Hole Longitude: -113.627077

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-01 Obtained License
1975-10-12 Drill Stem Test Performed
1975-10-17 Drill Stem Test Performed
1975-10-28 Drill Stem Test Performed
1975-10-29 Drill Stem Test Performed
1975-10-30 Finished Drilling
1975-10-30 Well Mode changed to Drilled and Cased
1975-10-31 Drill Stem Test Performed
1975-10-31 Well Log Performed
1975-11-01 Drill Stem Test Performed
1975-11-02 Production Casing Operation Performed
1975-11-14 Perforation Treatment Performed - Jet Perforation
1975-11-18 Perforation Treatment Performed - Acid Wash - No Pressure
1976-01-15 Perforation Treatment Performed - Cement Squeeze
1976-01-17 Perforation Treatment Performed - Jet Perforation
1976-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
1976-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-31 Perforation Treatment Performed - Jet Perforation
1976-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-02 Perforation Treatment Performed - Cement Squeeze
1976-02-06 Perforation Treatment Performed - Abrasa-Jet Perforation
1976-02-06 Perforation Treatment Performed - Acid Wash - No Pressure
1980-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-10 Perforation Treatment Performed - Jet Perforation
1980-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-13 Perforation Treatment Performed - Fractured
1980-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-15 Perforation Treatment Performed - Jet Perforation
1989-06-13 Well Log Performed
1989-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-14 Plug Back Performed
1989-06-16 Perforation Treatment Performed - Jet Perforation
1989-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-21 Perforation Treatment Performed - Jet Perforation
1989-06-21 Plug Back Performed
1989-06-21 Well Mode changed to Abandoned Zone
1989-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-24 Well Log Performed
1989-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-25 Perforation Treatment Performed - Jet Perforation
1989-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-26 Plug Back Performed
1989-06-26 Well Log Performed
1989-06-27 Perforation Treatment Performed - Jet Perforation
1989-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-28 Perforation Treatment Performed - Cement Squeeze
1989-06-29 Well Log Performed
1989-06-30 Perforation Treatment Performed - Jet Perforation
1989-07-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-08 Perforation Treatment Performed - Fractured
1991-07-25 Perforation Treatment Performed - Cement Squeeze
1991-07-25 Perforation Treatment Performed - Jet Perforation
1991-07-29 Perforation Treatment Performed - Jet Perforation
1991-07-30 Perforation Treatment Performed - Cement Squeeze
1991-08-02 Perforation Treatment Performed - Jet Perforation
1991-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-10 Well Began Production
1991-10-10 Well Fluid changed to Gas
1991-10-10 Well Mode changed to Flowing
1995-02-02 Perforation Treatment Performed - Cement Squeeze
1995-02-04 Well Log Performed
1995-02-05 Perforation Treatment Performed - Jet Perforation
1995-02-07 Well Log Performed
1995-02-10 Well Log Performed
1995-02-13 Perforation Treatment Performed - Jet Perforation
1995-02-28 Well Fluid changed to Gas
1995-02-28 Well Mode changed to Suspended
1998-12-22 Well Fluid changed to Gas
1998-12-22 Well Mode changed to Flowing
2001-04-01 Well Fluid changed to Gas
2001-04-01 Well Mode changed to Suspended
2006-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-04-28 Plug Back Performed
2006-04-28 Well Fluid changed to Gas
2006-04-28 Well Mode changed to Abandoned Zone
2006-05-01 Perforation Treatment Performed - Jet Perforation
2008-05-22 Perforation Treatment Performed - Cement Squeeze
2008-05-26 Perforation Treatment Performed - Cement Squeeze
2008-05-26 Perforation Treatment Performed - Jet Perforation
2008-05-30 Perforation Treatment Performed - Fractured
2011-09-14 Well Log Performed
2011-09-16 Perforation Treatment Performed - Jet Perforation
2011-09-16 Well Log Performed
2011-09-17 Perforation Treatment Performed - Cement Squeeze
2016-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-02 Plug Back Performed
2016-08-02 Well Log Performed
2016-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-03 Plug Back Performed
2016-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-04 Perforation Treatment Performed - Jet Perforation
2016-08-04 Plug Back Performed
2016-08-04 Well Log Performed
2016-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-05 Plug Back Performed
2017-06-01 Well Log Performed
2017-06-21 Perforation Treatment Performed - Cement Plug
2017-06-21 Perforation Treatment Performed - Cement Squeeze
2017-06-21 Perforation Treatment Performed - Jet Perforation
2017-06-21 Plug Back Performed
2017-06-21 Well Log Performed
2017-06-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-14 Perforation 1625.20 1627.90 7
1976-02-06 Hydra Jet Perforation 1623.70 1624.30 7
1976-02-06 Acid Wash 1623.70 1624.30 0
1980-03-10 Packing Device Capped w/Cement 1598.60 1614.60 0
1980-03-10 Perforation 1502.60 1511.70 6
1980-03-12 Acid Treatment 1502.60 1511.70 0
1980-03-13 Fracture 1502.60 1511.70 0
1980-05-15 Perforation 1476.00 1489.00 6
1980-05-15 Acid Treatment 1476.00 1511.70 0
1989-06-14 Packing Device Capped w/Cement 1457.00 1465.20 0
1989-06-16 Perforation 1379.00 1388.00 13
1975-11-18 Acid Wash 1625.20 1627.90 0
1989-06-18 Acid Treatment 1379.00 1388.00 0
1989-06-21 Packing Device Capped w/Cement 1352.00 1373.00 0
1989-06-21 Perforation 1304.00 1307.00 13
1989-06-22 Acid Treatment 1304.00 1307.00 0
1989-06-25 Perforation 1294.00 1295.50 13
1989-06-25 Acid Treatment 1294.00 1295.50 0
1989-06-26 Packing Device Capped w/Cement 1282.00 1290.00 0
1989-06-27 Perforation 1071.00 1071.40 13
1989-06-27 Perforation 1080.00 1080.40 13
1989-06-28 Acid Treatment 1071.00 1080.40 0
1976-01-15 Cement Squeeze 1625.20 1627.90 0
1989-06-28 Cement Squeeze 1071.00 1080.40 0
1989-06-30 Perforation 1087.00 1092.00 13
1989-06-30 Perforation 1101.00 1105.00 13
1989-07-01 Acid Treatment 1087.00 1105.00 0
1989-07-08 Fracture 1087.00 1105.00 0
1991-07-25 Perforation 1294.00 1295.50 13
1991-07-25 Cement Squeeze 1294.00 1295.50 0
1991-07-29 Perforation 1304.00 1307.00 13
1991-07-30 Cement Squeeze 1304.00 1307.00 0
1991-08-02 Perforation 1379.00 1388.00 13
1976-01-17 Perforation 1626.70 1627.90 7
1991-08-05 Acid Treatment 1087.00 1105.00 0
1995-02-02 Cement Squeeze 1087.00 1092.00 0
1995-02-05 Perforation 1394.50 1397.20 18
1995-02-05 Perforation 1405.70 1407.60 18
1995-02-13 Perforation 1389.60 1389.70 18
2006-04-28 Packing Device Capped w/Cement 1362.70 1370.70 0
2006-05-01 Perforation 1101.00 1105.00 17
2006-05-01 Perforation 1087.00 1092.00 17
2008-05-22 Cement Squeeze 1087.00 1092.00 0
2008-05-26 Cement Squeeze 1101.00 1105.00 0
1976-01-19 Acid Wash 1626.70 1627.90 0
2008-05-26 Perforation 1142.50 1146.50 17
2008-05-30 Fracture 1142.50 1146.50 0
2011-09-16 Perforation 547.00 549.00 17
2011-09-17 Cement Squeeze 547.00 549.00 0
2016-08-02 Packing Device Capped w/Cement 1280.80 1289.00 0
2016-08-03 Packing Device Capped w/Cement 1126.80 1135.00 0
2016-08-03 Packing Device Capped w/Cement 1056.30 1064.50 0
2016-08-04 Packing Device Capped w/Cement 530.80 539.00 0
2016-08-04 Perforation 366.00 367.50 15
2016-08-05 Packing Device Capped w/Cement 348.70 362.50 0
1976-01-20 Acid Treatment 1626.70 1627.90 0
2017-06-21 Perforation 341.00 342.00 17
2017-06-21 Cement Squeeze 341.00 342.00 0
2017-06-21 Cement Plug 319.00 348.70 0
1976-01-31 Perforation 1631.90 1632.50 13
1976-02-01 Acid Treatment 1631.90 1632.50 0
1976-02-02 Cement Squeeze 1626.70 1632.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 35 0.0 0.0 0.0
1991 1513 0.0 0.0 0.0
1992 8567 0.0 0.0 0.0
1993 3258 0.0 0.0 0.0
1998 227 0.0 0.0 0.0
1999 8622 0.0 0.0 0.0
2000 7780 0.0 0.0 0.0
2001 846 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-05-21 No Incident Encountered 0.00 0.00
1991-08-04 No Incident Encountered 0.00 0.00
2016-08-06 No Incident Encountered 0.00 0.00
2017-06-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References