X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253001000

Well Details

Well ID: 0494253001000
Loading map...
Location: 00/01-30-049-25W4/0
Location Alias: 00/01-30-49-25 W4M
Location Alias 2: 00/01-30-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: NEP HZ LEDUC-WB 1-30-49-25
Operator Name: NEP Canada ULC
License Number: 0464599
License Date: 2014-02-03
License Status: Issued
Spud Date: 2014-07-24
Final Drill Date: 2014-08-03
Well Total Depth: 3049.00 m
Surface Hole Latitude: 53.253189
Surface Hole Longitude: -113.660493

For data sources see[1][2]

Well History

Date Event
2014-02-03 Obtained License
2014-07-26 Surface Casing Operation Performed
2014-07-27 Direction Drilling Operation Performed - Deviate
2014-07-29 Direction Drilling Operation Performed - Horizontal
2014-07-31 Production Casing Operation Performed
2014-08-03 Finished Drilling
2014-08-03 Well Mode changed to Drilled and Cased
2014-08-04 Well Log Performed
2014-08-05 Liner Casing Operation Performed
2014-08-06 Rig Released
2014-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-27 Well Log Performed
2014-09-05 Well Began Production
2014-09-05 Well Fluid changed to Crude Oil
2014-09-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-07-24 Savanna Drilling Corp. 426 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-07-27 1319.00 Deviate (5 - 79 degrees)
2014-07-29 1700.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-13 Multi-Stage Fracture 2934.90 2935.00 0
2014-08-14 Multi-Stage Fracture 2250.20 2250.30 0
2014-08-14 Multi-Stage Fracture 2178.30 2178.40 0
2014-08-14 Multi-Stage Fracture 2079.20 2079.30 0
2014-08-14 Multi-Stage Fracture 1992.70 1992.80 0
2014-08-14 Multi-Stage Fracture 1877.80 1877.90 0
2014-08-14 Multi-Stage Fracture 1776.80 1776.90 0
2014-08-13 Multi-Stage Fracture 2848.20 2848.30 0
2014-08-13 Multi-Stage Fracture 2763.30 2763.40 0
2014-08-13 Multi-Stage Fracture 2693.30 2693.40 0
2014-08-13 Multi-Stage Fracture 2595.40 2595.50 0
2014-08-13 Multi-Stage Fracture 2536.70 2536.80 0
2014-08-13 Multi-Stage Fracture 2465.20 2465.30 0
2014-08-14 Multi-Stage Fracture 2393.30 2393.40 0
2014-08-14 Multi-Stage Fracture 2321.60 2321.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-13 2014-08-14 1,575 3,012 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.8895 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 10.6092 N/A
SiberProp 20/40 Trican silica crystalline 14808-60-7 100 4.646 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0251 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.095 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1805 N/A
formic acid 64-18-6 100 0.1805 N/A
non-hazardous ingredients Not Available 100 0.1805 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.2104 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.2104 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0922 N/A
propylene glycol 57-55-6 100 0.0922 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.2516 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-08-12 2014-08-14 Municipal Water 3167

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 2623 0.0 0.0 0.0
2015 5757 0.0 0.0 0.0
2016 8201 0.0 0.0 0.0
2017 6277 0.0 0.0 0.0
2018 6512 0.0 0.0 0.0
2019 8575 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-06 No Incident Encountered 0.00 0.00
2014-08-23 No Incident Encountered 0.00 0.00
2014-08-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References