X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253009000

Well Details

Well ID: 0494253009000
Loading map...
Location: 00/09-30-049-25W4/0
Location Alias: 00/09-30-49-25 W4M
Location Alias 2: 00/09-30-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 9-30-49-25
Operator Name: NEP Canada ULC
License Number: 0006716
License Date: 1953-07-09
License Status: Suspension
Spud Date: 1953-08-07
Final Drill Date: 1953-08-29
Well Total Depth: 1636.20 m
Surface Hole Latitude: 53.259683
Surface Hole Longitude: -113.637952

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-09 Obtained License
1953-08-19 Drill Stem Test Performed
1953-08-20 Drill Stem Test Performed
1953-08-21 Drill Stem Test Performed
1953-08-23 Liner Casing Operation Performed
1953-08-29 Finished Drilling
1953-08-29 Well Mode changed to Drilled and Cased
1953-09-01 Perforation Treatment Performed - Jet Perforation
1953-09-12 Well Began Production
1953-09-12 Well Fluid changed to Crude Oil
1953-09-12 Well Mode changed to Flowing
1972-11-16 Perforation Treatment Performed - Acid Wash - No Pressure
1974-05-30 Well Fluid changed to Crude Oil
1974-05-30 Well Mode changed to Pumping
1979-01-31 Perforation Treatment Performed - Cement Squeeze
1979-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-15 Perforation Treatment Performed - Jet Perforation
1981-06-17 Perforation Treatment Performed - Cement Squeeze
1981-06-23 Perforation Treatment Performed - Jet Perforation
1981-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-26 Perforation Treatment Performed - Cement Squeeze
1983-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-31 Perforation Treatment Performed - Jet Perforation
1989-02-15 Well Log Performed
1989-02-16 Perforation Treatment Performed - Cement Squeeze
1989-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-20 Perforation Treatment Performed - Jet Perforation
1989-02-23 Well Log Performed
1989-02-24 Perforation Treatment Performed - Cement Squeeze
1989-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-27 Perforation Treatment Performed - Jet Perforation
1989-03-21 Well Fluid changed to Crude Oil
1989-03-21 Well Mode changed to Suspended
1993-08-16 Well Log Performed
1993-08-19 Perforation Treatment Performed - Jet Perforation
1993-08-19 Well Log Performed
1993-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Pumping
1997-12-03 Well Log Performed
1997-12-04 Perforation Treatment Performed - Cement Squeeze
1997-12-05 Perforation Treatment Performed - Jet Perforation
1997-12-05 Well Log Performed
1998-04-30 Well Fluid changed to Crude Oil
1998-04-30 Well Mode changed to Suspended
2000-09-20 Perforation Treatment Performed - Jet Perforation
2000-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-30 Plug Back Performed
2002-01-30 Well Fluid changed to Crude Oil
2002-01-30 Well Mode changed to Abandoned Zone
2002-01-31 Perforation Treatment Performed - Jet Perforation
2004-02-27 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-02-28 Perforation Treatment Performed - Jet Perforation
2004-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-01 Perforation 1623.70 1625.20 13
1983-01-26 Cement Squeeze 1621.80 1622.00 0
1983-01-31 Perforation 1620.40 1620.60 10
1983-01-31 Acid Treatment 1620.40 1620.60 0
1989-02-16 Cement Squeeze 1620.40 1620.60 0
1989-02-20 Perforation 1619.10 1619.40 13
1989-02-20 Acid Treatment 1619.10 1619.40 0
1989-02-24 Cement Squeeze 1619.10 1619.40 0
1989-02-27 Perforation 1614.00 1614.30 13
1989-02-27 Acid Treatment 1614.00 1614.30 0
1993-08-19 Perforation 1617.50 1618.00 13
1972-11-16 Acid Wash 1623.70 1625.20 0
1993-08-20 Acid Treatment 1617.50 1618.00 0
1997-12-04 Cement Squeeze 1614.00 1618.00 0
1997-12-05 Perforation 1607.00 1608.00 14
2000-09-20 Perforation 1596.50 1599.50 20
2000-09-21 Acid Treatment 1596.50 1599.50 0
2002-01-30 Packing Device Capped w/Cement 1582.00 1590.00 0
2002-01-31 Perforation 1508.00 1513.00 17
2004-02-27 Bridge Plug, No Cement 1565.00 1566.00 0
2004-02-28 Perforation 1501.00 1504.00 17
2004-02-28 Perforation 1492.00 1498.00 17
1979-01-31 Cement Squeeze 1623.70 1625.20 0
2004-03-03 Acid Treatment 1508.00 1513.00 0
2004-03-03 Acid Treatment 1501.00 1504.00 0
2004-03-03 Acid Treatment 1492.00 1498.00 0
1979-03-15 Perforation 1622.50 1622.60 7
1979-03-15 Acid Treatment 1622.50 1622.60 0
1981-06-17 Cement Squeeze 1622.50 1622.60 0
1981-06-23 Perforation 1621.80 1622.00 10
1981-06-24 Acid Treatment 1621.80 1622.00 0
1983-01-25 Acid Treatment 1621.80 1622.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 24 0.0 0.0 0.0
1972 168 0.0 0.0 0.0
1973 7580 0.0 0.0 0.0
1974 6213 0.0 0.0 0.0
1975 6888 0.0 0.0 0.0
1976 8464 0.0 0.0 0.0
1977 8447 0.0 0.0 0.0
1978 8291 0.0 0.0 0.0
1979 6914 0.0 0.0 0.0
1980 7370 0.0 0.0 0.0
1981 7431 0.0 0.0 0.0
1982 8431 0.0 0.0 0.0
1983 7896 0.0 0.0 0.0
1984 8528 0.0 0.0 0.0
1985 8407 0.0 0.0 0.0
1986 8545 0.0 0.0 0.0
1987 7873 0.0 0.0 0.0
1988 8326 0.0 0.0 0.0
1989 1896 0.0 0.0 0.0
1993 2717 0.0 0.0 0.0
1994 2463 0.0 0.0 0.0
1995 1298 0.0 0.0 0.0
1996 2402 0.0 0.0 0.0
1997 2534 0.0 0.0 0.0
1998 485 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References