If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494253013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.26395,"lon":-113.656438,"icon":""}]} |
Location: 00/13-30-049-25W4/0 | |
Location Alias: 00/13-30-49-25 W4M | |
Location Alias 2: 00/13-30-049-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 25 | |
Section: 30 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 13-30-49-25 | |
Operator Name: NEP Canada ULC | |
License Number: 0005877 | |
License Date: 1952-12-24 | |
License Status: Abandoned | |
Spud Date: 1953-02-05 | |
Final Drill Date: 1953-03-06 | |
Well Total Depth: 1631.60 m | |
Surface Hole Latitude: 53.263950 | |
Surface Hole Longitude: -113.656438 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-12-24 | Obtained License |
1953-02-20 | Drill Stem Test Performed |
1953-02-25 | Drill Stem Test Performed |
1953-02-27 | Drill Stem Test Performed |
1953-03-03 | Liner Casing Operation Performed |
1953-03-06 | Finished Drilling |
1953-03-06 | Lost Circulation Occurred |
1953-03-06 | Well Mode changed to Drilled and Cased |
1953-03-09 | Perforation Treatment Performed - Jet Perforation |
1953-03-12 | Well Began Production |
1953-03-12 | Well Fluid changed to Crude Oil |
1953-03-12 | Well Mode changed to Flowing |
1973-08-16 | Well Fluid changed to Crude Oil |
1973-08-16 | Well Mode changed to Pumping |
1974-09-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-09-03 | Perforation Treatment Performed - Cement Squeeze |
1974-09-05 | Perforation Treatment Performed - Acid Wash - No Pressure |
1974-09-05 | Perforation Treatment Performed - Jet Perforation |
1978-02-22 | Perforation Treatment Performed - Cement Squeeze |
1978-02-22 | Perforation Treatment Performed - Jet Perforation |
1978-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-21 | Perforation Treatment Performed - Cement Squeeze |
1988-09-21 | Well Log Performed |
1988-09-22 | Perforation Treatment Performed - Jet Perforation |
1988-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-21 | Perforation Treatment Performed - Cement Squeeze |
1989-09-21 | Well Log Performed |
1989-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-25 | Perforation Treatment Performed - Jet Perforation |
1989-09-25 | Well Log Performed |
1989-09-27 | Well Log Performed |
1989-09-28 | Perforation Treatment Performed - Cement Squeeze |
1989-10-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-10-03 | Perforation Treatment Performed - Jet Perforation |
1989-10-03 | Well Log Performed |
1996-08-01 | Well Fluid changed to Crude Oil |
1996-08-01 | Well Mode changed to Suspended |
1997-08-10 | Well Log Performed |
1997-08-16 | Well Log Performed |
1997-08-20 | Well Log Performed |
1998-12-06 | Well Log Performed |
1998-12-07 | Perforation Treatment Performed - Jet Perforation |
1998-12-07 | Well Fluid changed to Crude Oil |
1998-12-07 | Well Log Performed |
1998-12-07 | Well Mode changed to Suspended |
2001-03-09 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2001-03-09 | Perforation Treatment Performed - Jet Perforation |
2001-03-14 | Perforation Treatment Performed - Jet Perforation |
2019-07-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-07-30 | Plug Back Performed |
2019-07-30 | Well Log Performed |
2019-07-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-07-31 | Perforation Treatment Performed - Jet Perforation |
2019-07-31 | Plug Back Performed |
2019-07-31 | Well Log Performed |
2019-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-08-02 | Perforation Treatment Performed - Cement Squeeze |
2019-08-02 | Plug Back Performed |
2019-10-09 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-03-09 | Perforation | 1627.60 | 1629.20 | 13 |
1988-09-22 | Perforation | 1620.00 | 1620.30 | 13 |
1988-09-23 | Acid Treatment | 1620.00 | 1620.30 | 0 |
1989-09-21 | Cement Squeeze | 1620.00 | 1620.30 | 0 |
1989-09-25 | Perforation | 1616.00 | 1616.30 | 13 |
1989-09-25 | Acid Treatment | 1616.00 | 1616.30 | 0 |
1989-09-28 | Cement Squeeze | 1616.00 | 1616.30 | 0 |
1989-10-03 | Perforation | 1618.20 | 1618.60 | 13 |
1989-10-03 | Acid Treatment | 1618.20 | 1618.60 | 0 |
1998-12-07 | Perforation | 1333.00 | 1334.50 | 17 |
2001-03-09 | Bridge Plug, No Cement | 1330.00 | 1331.00 | 0 |
1974-09-03 | Acid Treatment | 1627.60 | 1629.20 | 0 |
2001-03-09 | Perforation | 1100.00 | 1100.70 | 80 |
2001-03-09 | Perforation | 1084.60 | 1085.40 | 17 |
2001-03-14 | Perforation | 1089.70 | 1092.40 | 18 |
2019-07-30 | Packing Device Capped w/Cement | 1322.00 | 1330.00 | 0 |
2019-07-31 | Packing Device Capped w/Cement | 1072.00 | 1080.00 | 0 |
2019-07-31 | Perforation | 356.00 | 357.00 | 13 |
2019-08-02 | Cement Squeeze | 356.00 | 357.00 | 0 |
2019-08-02 | Packing Device Capped w/Cement | 341.00 | 349.00 | 0 |
1974-09-03 | Cement Squeeze | 1627.60 | 1629.20 | 0 |
1974-09-05 | Perforation | 1626.10 | 1627.00 | 7 |
1974-09-05 | Acid Wash | 1626.10 | 1627.00 | 0 |
1978-02-22 | Cement Squeeze | 1626.10 | 1627.00 | 0 |
1978-02-22 | Perforation | 1623.40 | 1623.70 | 7 |
1978-02-24 | Acid Treatment | 1623.40 | 1623.70 | 0 |
1988-09-21 | Cement Squeeze | 1623.40 | 1623.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4284 | 0.0 | 0.0 | 0.0 |
1968 | 4472 | 0.0 | 0.0 | 0.0 |
1969 | 3378 | 0.0 | 0.0 | 0.0 |
1970 | 4358 | 0.0 | 0.0 | 0.0 |
1971 | 4334 | 0.0 | 0.0 | 0.0 |
1972 | 5221 | 0.0 | 0.0 | 0.0 |
1973 | 7654 | 0.0 | 0.0 | 0.0 |
1974 | 7900 | 0.0 | 0.0 | 0.0 |
1975 | 8092 | 0.0 | 0.0 | 0.0 |
1976 | 8260 | 0.0 | 0.0 | 0.0 |
1977 | 8321 | 0.0 | 0.0 | 0.0 |
1978 | 7993 | 0.0 | 0.0 | 0.0 |
1979 | 8244 | 0.0 | 0.0 | 0.0 |
1980 | 8227 | 0.0 | 0.0 | 0.0 |
1981 | 7785 | 0.0 | 0.0 | 0.0 |
1982 | 8303 | 0.0 | 0.0 | 0.0 |
1983 | 7596 | 0.0 | 0.0 | 0.0 |
1984 | 8293 | 0.0 | 0.0 | 0.0 |
1985 | 7760 | 0.0 | 0.0 | 0.0 |
1986 | 4773 | 0.0 | 0.0 | 0.0 |
1987 | 7123 | 0.0 | 0.0 | 0.0 |
1988 | 7267 | 0.0 | 0.0 | 0.0 |
1989 | 7752 | 0.0 | 0.0 | 0.0 |
1990 | 8545 | 0.0 | 0.0 | 0.0 |
1991 | 8388 | 0.0 | 0.0 | 0.0 |
1992 | 8198 | 0.0 | 0.0 | 0.0 |
1993 | 8036 | 0.0 | 0.0 | 0.0 |
1994 | 2326 | 0.0 | 0.0 | 0.0 |
1995 | 5933 | 0.0 | 0.0 | 0.0 |
1996 | 3276 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1953-03-06 | Lost Circulation | 1604.50 | 1604.50 |
2001-03-09 | No Incident Encountered | 0.00 | 0.00 |
2019-08-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]