X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253013003

Well Details

Well ID: 0494253013003
Loading map...
Location: 00/13-30-049-25W4/3
Location Alias: 00/13-30-49-25 W4M
Location Alias 2: 00/13-30-049-25 W4/03
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 13-30-49-25
Operator Name: NEP Canada ULC
License Number: 0005877
License Date: 1952-12-24
License Status: Abandoned
Spud Date: 1953-02-05
Final Drill Date: 1953-03-06
Well Total Depth: 1631.60 m
Surface Hole Latitude: 53.263950
Surface Hole Longitude: -113.656438

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-24 Obtained License
1953-02-20 Drill Stem Test Performed
1953-02-25 Drill Stem Test Performed
1953-02-27 Drill Stem Test Performed
1953-03-03 Liner Casing Operation Performed
1953-03-06 Finished Drilling
1953-03-06 Lost Circulation Occurred
1953-03-06 Well Mode changed to Drilled and Cased
1953-03-09 Perforation Treatment Performed - Jet Perforation
1974-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-03 Perforation Treatment Performed - Cement Squeeze
1974-09-05 Perforation Treatment Performed - Acid Wash - No Pressure
1974-09-05 Perforation Treatment Performed - Jet Perforation
1978-02-22 Perforation Treatment Performed - Cement Squeeze
1978-02-22 Perforation Treatment Performed - Jet Perforation
1978-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-21 Perforation Treatment Performed - Cement Squeeze
1988-09-21 Well Log Performed
1988-09-22 Perforation Treatment Performed - Jet Perforation
1988-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-21 Perforation Treatment Performed - Cement Squeeze
1989-09-21 Well Log Performed
1989-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-25 Perforation Treatment Performed - Jet Perforation
1989-09-25 Well Log Performed
1989-09-27 Well Log Performed
1989-09-28 Perforation Treatment Performed - Cement Squeeze
1989-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-03 Perforation Treatment Performed - Jet Perforation
1989-10-03 Well Log Performed
1997-08-10 Well Log Performed
1997-08-16 Well Log Performed
1997-08-20 Well Log Performed
1998-12-06 Well Log Performed
1998-12-07 Perforation Treatment Performed - Jet Perforation
1998-12-07 Well Log Performed
2001-03-09 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-03-09 Perforation Treatment Performed - Jet Perforation
2001-03-14 Perforation Treatment Performed - Jet Perforation
2019-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-30 Plug Back Performed
2019-07-30 Well Log Performed
2019-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-31 Perforation Treatment Performed - Jet Perforation
2019-07-31 Plug Back Performed
2019-07-31 Well Log Performed
2019-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-02 Perforation Treatment Performed - Cement Squeeze
2019-08-02 Plug Back Performed
2019-08-02 Well Mode changed to Abandoned Zone
2019-10-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-03-09 Perforation 1627.60 1629.20 13
1988-09-22 Perforation 1620.00 1620.30 13
1988-09-23 Acid Treatment 1620.00 1620.30 0
1989-09-21 Cement Squeeze 1620.00 1620.30 0
1989-09-25 Perforation 1616.00 1616.30 13
1989-09-25 Acid Treatment 1616.00 1616.30 0
1989-09-28 Cement Squeeze 1616.00 1616.30 0
1989-10-03 Perforation 1618.20 1618.60 13
1989-10-03 Acid Treatment 1618.20 1618.60 0
1998-12-07 Perforation 1333.00 1334.50 17
2001-03-09 Bridge Plug, No Cement 1330.00 1331.00 0
1974-09-03 Acid Treatment 1627.60 1629.20 0
2001-03-09 Perforation 1100.00 1100.70 80
2001-03-09 Perforation 1084.60 1085.40 17
2001-03-14 Perforation 1089.70 1092.40 18
2019-07-30 Packing Device Capped w/Cement 1322.00 1330.00 0
2019-07-31 Packing Device Capped w/Cement 1072.00 1080.00 0
2019-07-31 Perforation 356.00 357.00 13
2019-08-02 Cement Squeeze 356.00 357.00 0
2019-08-02 Packing Device Capped w/Cement 341.00 349.00 0
1974-09-03 Cement Squeeze 1627.60 1629.20 0
1974-09-05 Perforation 1626.10 1627.00 7
1974-09-05 Acid Wash 1626.10 1627.00 0
1978-02-22 Cement Squeeze 1626.10 1627.00 0
1978-02-22 Perforation 1623.40 1623.70 7
1978-02-24 Acid Treatment 1623.40 1623.70 0
1988-09-21 Cement Squeeze 1623.40 1623.70 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1953-03-06 Lost Circulation 1604.50 1604.50
2001-03-09 No Incident Encountered 0.00 0.00
2019-08-01 No Incident Encountered 0.00 0.00

For data sources see[5]

References