X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253015002

Well Details

Well ID: 0494253015002
Loading map...
Location: 00/15-30-049-25W4/2
Location Alias: 00/15-30-49-25 W4M
Location Alias 2: 00/15-30-049-25 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 15-30-49-25
Operator Name: NEP Canada ULC
License Number: 0006885
License Date: 1953-08-07
License Status: Issued
Spud Date: 1953-10-06
Final Drill Date: 1953-10-25
Well Total Depth: 1630.10 m
Surface Hole Latitude: 53.263289
Surface Hole Longitude: -113.643999

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-07 Obtained License
1953-10-23 Liner Casing Operation Performed
1953-10-25 Finished Drilling
1953-10-25 Well Mode changed to Drilled and Cased
1953-10-28 Perforation Treatment Performed - Jet Perforation
1976-01-21 Perforation Treatment Performed - Cement Squeeze
1976-01-25 Perforation Treatment Performed - Jet Perforation
1976-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-03 Perforation Treatment Performed - Cement Squeeze
1978-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-04 Perforation Treatment Performed - Jet Perforation
1978-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-18 Perforation Treatment Performed - Cement Squeeze
1982-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-19 Perforation Treatment Performed - Jet Perforation
1989-07-05 Well Log Performed
1989-07-06 Perforation Treatment Performed - Cement Squeeze
1989-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-07 Perforation Treatment Performed - Jet Perforation
1989-07-07 Well Log Performed
1999-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-28 Plug Back Performed
1999-01-28 Well Log Performed
1999-01-29 Perforation Treatment Performed - Jet Perforation
1999-01-29 Well Log Performed
1999-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-30 Plug Back Performed
1999-01-30 Well Log Performed
1999-01-31 Perforation Treatment Performed - Jet Perforation
1999-01-31 Well Log Performed
1999-02-03 Well Began Production
1999-02-03 Well Fluid changed to Gas
1999-02-03 Well Mode changed to Flowing
2001-03-17 Perforation Treatment Performed - Cement Squeeze
2001-03-17 Well Fluid changed to Gas
2001-03-17 Well Mode changed to Abandoned Zone
2001-03-20 Perforation Treatment Performed - Jet Perforation
2001-03-21 Perforation Treatment Performed - Fractured
2002-11-12 Perforation Treatment Performed - Cement Squeeze
2002-11-12 Plug Back Performed
2002-11-14 Perforation Treatment Performed - Cement Squeeze
2002-11-14 Perforation Treatment Performed - Jet Perforation
2002-11-15 Perforation Treatment Performed - Jet Perforation
2002-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-03-09 Perforation Treatment Performed - Jet Perforation
2017-03-16 Perforation Treatment Performed - Jet Perforation
2017-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-04-03 Well Log Performed
2017-04-06 Perforation Treatment Performed - Casing Patch (Over Perfs)
2017-04-06 Perforation Treatment Performed - Jet Perforation
2017-04-06 Well Log Performed
2017-04-08 Perforation Treatment Performed - Casing Patch (Over Perfs)
2017-04-08 Perforation Treatment Performed - Jet Perforation
2017-04-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-28 Perforation 1624.90 1626.40 13
1982-12-19 Perforation 1621.00 1621.20 10
1982-12-19 Acid Treatment 1621.00 1621.20 0
1989-07-06 Cement Squeeze 1621.00 1621.20 0
1989-07-07 Perforation 1617.10 1617.30 13
1989-07-07 Acid Treatment 1617.10 1617.30 0
1999-01-28 Packing Device Capped w/Cement 1602.00 1610.00 0
1999-01-29 Perforation 1328.50 1330.50 18
1999-01-30 Packing Device Capped w/Cement 1312.00 1320.00 0
1999-01-31 Perforation 1087.00 1089.00 18
1999-01-31 Perforation 1085.00 1086.00 18
1976-01-21 Cement Squeeze 1624.90 1626.40 0
2001-03-17 Cement Squeeze 1087.00 1089.00 0
2001-03-17 Cement Squeeze 1085.00 1086.00 0
2001-03-20 Perforation 1311.00 1313.10 20
2001-03-21 Fracture 1311.00 1313.10 0
2002-11-12 Cement Squeeze 1311.00 1313.10 0
2002-11-14 Perforation 1328.50 1330.50 18
2002-11-14 Cement Squeeze 1328.50 1330.50 0
2002-11-15 Perforation 1586.50 1588.00 17
2002-11-16 Acid Treatment 1586.50 1588.00 0
2017-03-09 Perforation 1590.60 1596.60 17
1976-01-25 Perforation 1623.40 1624.00 7
2017-03-16 Perforation 1620.00 1626.00 17
2017-03-16 Perforation 1606.00 1612.00 17
2017-03-24 Acid Treatment 1620.00 1626.00 0
2017-03-24 Acid Treatment 1606.00 1612.00 0
2017-03-24 Acid Treatment 1590.60 1596.60 0
2017-04-06 Perforation 1328.50 1330.50 18
2017-04-06 Casing Patch 1326.50 1332.60 0
2017-04-06 Perforation 1311.00 1313.10 20
2017-04-06 Casing Patch 1309.00 1315.10 0
2017-04-08 Perforation 1087.00 1089.00 18
1976-01-26 Acid Treatment 1623.40 1624.00 0
2017-04-08 Perforation 1085.00 1086.00 18
2017-04-08 Casing Patch 1082.50 1091.50 0
1978-05-03 Cement Squeeze 1623.40 1624.00 0
1978-05-04 Perforation 1622.40 1622.50 7
1978-05-04 Acid Treatment 1622.40 1622.50 0
1978-11-28 Acid Treatment 1622.40 1622.50 0
1982-12-18 Cement Squeeze 1622.40 1622.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 310 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-04-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References