If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494270203020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.194241,"lon":-113.845241,"icon":""}]} |
Location: 02/03-02-049-27W4/0 | |
Location Alias: 02/03-02-49-27 W4M | |
Location Alias 2: 02/03-02-049-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 27 | |
Section: 02 | |
County/Municipality: Leduc County | |
Well Name: CLEARBROOK GLENPK 3-2-49-27 | |
Operator Name: Enhance Energy Inc. | |
License Number: 0004201 | |
License Date: 1952-02-09 | |
License Status: Suspension | |
Spud Date: 1952-03-08 | |
Final Drill Date: 1952-04-09 | |
Well Total Depth: 1690.70 m | |
Surface Hole Latitude: 53.194241 | |
Surface Hole Longitude: -113.845241 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-02-09 | Obtained License |
1952-04-07 | Drill Stem Test Performed |
1952-04-08 | Drill Stem Test Performed |
1952-04-09 | Drill Stem Test Performed |
1952-04-09 | Finished Drilling |
1952-04-09 | Well Mode changed to Drilled and Cased |
1952-04-12 | Perforation Treatment Performed - Open-Hole Completion |
1952-04-12 | Production Casing Operation Performed |
1952-04-18 | Well Began Production |
1952-04-18 | Well Fluid changed to Crude Oil |
1952-04-18 | Well Mode changed to Flowing |
1952-05-04 | Perforation Treatment Performed - Jet Perforation |
1952-07-27 | Drill Stem Test Performed |
1952-07-27 | Perforation Treatment Performed - Cement Squeeze |
1952-08-04 | Perforation Treatment Performed - Open-Hole Completion |
1958-01-15 | Well Fluid changed to Crude Oil |
1958-01-15 | Well Mode changed to Pumping |
1962-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-01-12 | Well Fluid changed to Crude Oil |
1970-01-12 | Well Mode changed to Suspended |
2008-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-04-12 | Open Hole/Barefoot Completion | 1686.20 | 1690.70 | 0 |
1952-05-04 | Perforation | 1683.70 | 1684.30 | 13 |
1952-07-27 | Cement Squeeze | 1683.70 | 1690.70 | 0 |
1952-08-04 | Open Hole/Barefoot Completion | 1686.20 | 1690.70 | 0 |
1962-02-02 | Acid Treatment | 1686.20 | 1690.70 | 0 |
2008-10-02 | Packing Device Capped w/Cement | 1667.00 | 1675.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 1739 | 0.0 | 0.0 | 0.0 |
1968 | 6625 | 0.0 | 0.0 | 0.0 |
1969 | 6411 | 0.0 | 0.0 | 0.0 |
For data sources see[5]