X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495050716000

Well Details

Well ID: 0495050716000
Loading map...
Location: 00/16-07-049-05W5/0
Location Alias: 00/16-07-49-05 W5M
Location Alias 2: 00/16-07-049-05 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 05
Section: 07
County/Municipality: Brazeau County
Well Name: DEKALB CREE PEMBINA 16-7-49-5
Operator Name: ARC Resources Ltd.
License Number: 0018017
License Date: 1959-10-26
License Status: Suspension
Spud Date: 1959-11-26
Final Drill Date: 1959-12-02
Well Total Depth: 1302.40 m
Surface Hole Latitude: 53.219585
Surface Hole Longitude: -114.711805

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-10-26 Obtained License
1959-12-02 Finished Drilling
1959-12-02 Well Mode changed to Drilled and Cased
1959-12-03 Production Casing Operation Performed
1959-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-09 Perforation Treatment Performed - Jet Perforation
1959-12-11 Perforation Treatment Performed - Fractured
1959-12-23 Well Began Production
1959-12-23 Well Fluid changed to Crude Oil
1959-12-23 Well Mode changed to Flowing
1973-04-27 Well Fluid changed to Crude Oil
1973-04-27 Well Mode changed to Pumping
1973-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-12 Perforation Treatment Performed - Jet Perforation
1986-06-12 Well Log Performed
1986-06-14 Perforation Treatment Performed - Fractured
2020-01-01 Well Fluid changed to Crude Oil
2020-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-09 Perforation 1272.20 1276.20 3
1959-12-09 Perforation 1276.20 1281.40 7
1959-12-09 Acid Treatment 1272.20 1281.40 0
1959-12-11 Fracture 1272.20 1281.40 0
1973-05-02 Acid Treatment 1272.20 1281.40 0
1974-05-30 Acid Treatment 1272.20 1281.40 0
1986-06-12 Perforation 1272.80 1281.90 13
1986-06-14 Fracture 1272.20 1281.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8539 0.0 0.0 0.0
1968 8728 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 8607 0.0 0.0 0.0
1971 8062 0.0 0.0 0.0
1972 8735 0.0 0.0 0.0
1973 7860 0.0 0.0 0.0
1974 7248 0.0 0.0 0.0
1975 5528 0.0 0.0 0.0
1976 5289 0.0 0.0 0.0
1977 4776 0.0 0.0 0.0
1978 8646 0.0 0.0 0.0
1979 8665 0.0 0.0 0.0
1980 8652 0.0 0.0 0.0
1981 7880 0.0 0.0 0.0
1982 8382 0.0 0.0 0.0
1983 8586 0.0 0.0 0.0
1984 8572 0.0 0.0 0.0
1985 8167 0.0 0.0 0.0
1986 8009 0.0 0.0 0.0
1987 8443 0.0 0.0 0.0
1988 8272 0.0 0.0 0.0
1989 8363 0.0 0.0 0.0
1990 8034 0.0 0.0 0.0
1991 8097 0.0 0.0 0.0
1992 8148 0.0 0.0 0.0
1993 8088 0.0 0.0 0.0
1994 8179 0.0 0.0 0.0
1995 8037 0.0 0.0 0.0
1996 8517 0.0 0.0 0.0
1997 8529 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8300 0.0 0.0 0.0
2000 8772 0.0 0.0 0.0
2001 8221 0.0 0.0 0.0
2002 8750 0.0 0.0 0.0
2003 8057 0.0 0.0 0.0
2004 8572 0.0 0.0 0.0
2005 8359 0.0 0.0 0.0
2006 8497 0.0 0.0 0.0
2007 8664 0.0 0.0 0.0
2008 8669 0.0 0.0 0.0
2009 8538 0.0 0.0 0.0
2010 8678 0.0 0.0 0.0
2011 8595 0.0 0.0 0.0
2012 8753 0.0 0.0 0.0
2013 7652 0.0 0.0 0.0
2014 8602 0.0 0.0 0.0
2015 8612 0.0 0.0 0.0
2016 8493 0.0 0.0 0.0
2017 8445 0.0 0.0 0.0
2018 8341 0.0 0.0 0.0
2019 6102 0.0 0.0 0.0

For data sources see[5]

References