If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495050908020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.200835,"lon":-114.642708,"icon":""}]} |
| Location: 02/08-09-049-05W5/0 | |
| Location Alias: 02/08-09-49-05 W5M | |
| Location Alias 2: 02/08-09-049-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 09 | |
| County/Municipality: Brazeau County | |
| Well Name: ARC 102 HZ PEMBINA 8-9-49-5 | |
| Operator Name: ARC Resources Ltd. | |
| License Number: 0465695 | |
| License Date: 2014-03-13 | |
| License Status: Issued | |
| Spud Date: 2014-09-12 | |
| Final Drill Date: 2014-09-19 | |
| Well Total Depth: 3027.00 m | |
| Surface Hole Latitude: 53.200835 | |
| Surface Hole Longitude: -114.642708 |
| Date | Event |
|---|---|
| 2014-03-13 | Obtained License |
| 2014-09-13 | Surface Casing Operation Performed |
| 2014-09-15 | Direction Drilling Operation Performed - Deviate |
| 2014-09-15 | Direction Drilling Operation Performed - Horizontal |
| 2014-09-16 | Intermediate Casing Operation Performed |
| 2014-09-19 | Finished Drilling |
| 2014-09-19 | Well Log Performed |
| 2014-09-19 | Well Mode changed to Drilled and Cased |
| 2014-09-20 | Liner Casing Operation Performed |
| 2014-09-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-09-20 | Rig Released |
| 2014-11-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-02 | Well Began Production |
| 2014-12-02 | Well Fluid changed to Crude Oil |
| 2014-12-02 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-09-13 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-09-15 | 982.00 | Deviate (5 - 79 degrees) |
| 2014-09-15 | 1399.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-09-20 | Open Hole/Barefoot Completion | 3000.00 | 3027.00 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2382.20 | 2382.30 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2313.60 | 2313.70 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2248.30 | 2248.40 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2180.70 | 2180.80 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2115.30 | 2115.40 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2047.60 | 2047.70 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1979.70 | 1979.80 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1914.00 | 1914.10 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1844.40 | 1844.50 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1777.50 | 1777.60 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2995.20 | 2995.30 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1711.10 | 1711.20 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1643.60 | 1643.70 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1575.80 | 1575.90 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 1508.90 | 1509.00 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2926.00 | 2926.10 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2848.00 | 2848.10 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2775.70 | 2775.80 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2693.20 | 2693.30 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2615.40 | 2615.50 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2539.30 | 2539.40 | 0 |
| 2014-11-01 | Multi-Stage Fracture | 2461.90 | 2462.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-11-01 | 2014-11-01 | 1,298 | 3,065 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 86.4775 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 12.5006 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.0601 | N/A | ||
| 50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.5894 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0128 | N/A | |
| Water | 7732-18-5 | 100 | 0.0135 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.2013 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0964 | N/A | |
| DWP-967 | Calfrac | Surfactant | 2-Propanol | 67-63-0 | 100 | 0.0872 | N/A | |
| Polyol | 9171 | 100 | 0.0888 | N/A | ||||
| Quaternary Amine Compound | 9171 | 100 | 0.0884 | N/A | ||||
| Surfactant 1 | 9171 | 100 | 0.0872 | N/A | ||||
| Surfactant 2 | 9171 | 100 | 0.0888 | N/A | ||||
| Terpenes and Terpenoids. sweet orange oil | 68647-72-3 | 100 | 0.0872 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-11-01 | 2014-11-01 | Surface Water - Runoff | 3065 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 716 | 0.0 | 0.0 | 0.0 |
| 2015 | 8679 | 0.0 | 0.0 | 0.0 |
| 2016 | 8645 | 0.0 | 0.0 | 0.0 |
| 2017 | 8510 | 0.0 | 0.0 | 0.0 |
| 2018 | 7814 | 0.0 | 0.0 | 0.0 |
| 2019 | 8674 | 0.0 | 0.0 | 0.0 |
| 2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-09-20 | No Incident Encountered | 0.00 | 0.00 |
| 2014-11-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]