If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495061914020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.252259,"lon":-114.893769,"icon":""}]} |
| Location: 02/14-19-049-06W5/0 | |
| Location Alias: 02/14-19-49-06 W5M | |
| Location Alias 2: 02/14-19-049-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 19 | |
| County/Municipality: Brazeau County | |
| Well Name: ARC HZ 102 PEMBINA 14-19-49-6 | |
| Operator Name: ARC Resources Ltd. | |
| License Number: 0457894 | |
| License Date: 2013-07-05 | |
| License Status: Issued | |
| Spud Date: 2013-08-05 | |
| Final Drill Date: 2013-08-11 | |
| Well Total Depth: 2781.00 m | |
| Surface Hole Latitude: 53.252259 | |
| Surface Hole Longitude: -114.893769 |
| Date | Event |
|---|---|
| 2013-07-05 | Obtained License |
| 2013-08-05 | Surface Casing Operation Performed |
| 2013-08-06 | Direction Drilling Operation Performed - Deviate |
| 2013-08-06 | Direction Drilling Operation Performed - Horizontal |
| 2013-08-08 | Well Log Performed |
| 2013-08-09 | Intermediate Casing Operation Performed |
| 2013-08-11 | Finished Drilling |
| 2013-08-11 | Liner Casing Operation Performed |
| 2013-08-11 | Well Log Performed |
| 2013-08-11 | Well Mode changed to Drilled and Cased |
| 2013-08-12 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-08-12 | Rig Released |
| 2013-08-22 | Well Log Performed |
| 2013-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-08-30 | Well Began Production |
| 2013-08-30 | Well Fluid changed to Crude Oil |
| 2013-08-30 | Well Mode changed to Flowing |
| 2013-09-26 | Well Fluid changed to Crude Oil |
| 2013-09-26 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-08-05 | Excalibur Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-08-06 | 719.40 | Deviate (5 - 79 degrees) |
| 2013-08-06 | 1620.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-08-12 | Open Hole/Barefoot Completion | 2762.00 | 2781.00 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2051.50 | 2051.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 1960.50 | 1960.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 1869.50 | 1869.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2758.00 | 2758.10 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2688.50 | 2688.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2597.50 | 2597.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2506.50 | 2506.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2415.50 | 2415.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2324.50 | 2324.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2233.50 | 2233.60 | 0 |
| 2013-08-29 | Multi-Stage Fracture | 2142.50 | 2142.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-08-29 | 2013-08-29 | 1,332 | 300 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Nitrogen | 7727-37-9 | 100 | 16.5425 | N/A | |||
| Water | Not Available | 100 | 47.793 | N/A | ||||
| 20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 33.2126 | N/A | ||
| 50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.659 | N/A | ||
| B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0047 | N/A | |
| Methyl Alcohol | 67-56-1 | 100 | 0.0047 | N/A | ||||
| Breaker-1Z | Sanjel | Breaker | Cellulase enzyme | 9012-54-8 | 100 | 0.0974 | N/A | |
| Ethylene Glycol | 107-21-1 | 100 | 0.0955 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0955 | N/A | ||||
| Water | Not Available | 100 | 0.0957 | N/A | ||||
| BUFFER-A | Sanjel | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0957 | N/A | |
| Water | Not Available | 100 | 0.0957 | N/A | ||||
| SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.0941 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0941 | N/A | ||||
| FA-1 | Sanjel | Foamer | Ammonium C8-10 Alcohol | 68891-29-2 | 100 | 0.185 | N/A | |
| Ethanol | 64-17-5 | 100 | 0.185 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.185 | N/A | ||||
| WG-6ZL | Sanjel | Gelling Agent | Polysaccharide Suspension | Not Available | 100 | 0.2935 | N/A | |
| NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0239 | N/A | |
| Diethylenetriamine | 111-40-0 | 100 | 0.0239 | N/A | ||||
| Isopropyl Alcohol | 67-63-0 | 100 | 0.0239 | N/A | ||||
| Non-Hazardous Ingredients | Not Available | 100 | 0.0239 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-08-24 | 2013-08-24 | Surface Water - Runoff | 458 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 2248 | 0.0 | 0.0 | 0.0 |
| 2014 | 8438 | 0.0 | 0.0 | 0.0 |
| 2015 | 8464 | 0.0 | 0.0 | 0.0 |
| 2016 | 8201 | 0.0 | 0.0 | 0.0 |
| 2017 | 8042 | 0.0 | 0.0 | 0.0 |
| 2018 | 7339 | 0.0 | 0.0 | 0.0 |
| 2019 | 7063 | 0.0 | 0.0 | 0.0 |
| 2020 | 2092 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-08-12 | No Incident Encountered | 0.00 | 0.00 |
| 2013-09-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]