X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495072201000

Well Details

Well ID: 0495072201000
Loading map...
Location: 00/01-22-049-07W5/0
Location Alias: 00/01-22-49-07 W5M
Location Alias 2: 00/01-22-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 22
County/Municipality: Drayton Valley
Well Name: ARC HZ PEMBINA 1-22-49-7
Operator Name: ARC Resources Ltd.
License Number: 0467913
License Date: 2014-07-08
License Status: Amended
Spud Date: 2014-10-04
Final Drill Date: 2014-10-12
Well Total Depth: 4006.00 m
Surface Hole Latitude: 53.233774
Surface Hole Longitude: -114.967478

For data sources see[1][2]

Well History

Date Event
2014-07-08 Obtained License
2014-10-04 Surface Casing Operation Performed
2014-10-05 Direction Drilling Operation Performed - Deviate
2014-10-07 Direction Drilling Operation Performed - Horizontal
2014-10-08 Intermediate Casing Operation Performed
2014-10-12 Finished Drilling
2014-10-12 Well Log Performed
2014-10-12 Well Mode changed to Drilled and Cased
2014-10-13 Liner Casing Operation Performed
2014-10-13 Perforation Treatment Performed - Open-Hole Completion
2014-10-15 Rig Released
2014-10-28 Well Log Performed
2014-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-24 Well Began Production
2014-11-24 Well Fluid changed to Crude Oil
2014-11-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-04 Excalibur Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-10-05 782.30 Deviate (5 - 79 degrees)
2014-10-07 1722.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-13 Open Hole/Barefoot Completion 3985.00 4006.00 0
2014-11-04 Multi-Stage Fracture 3324.90 3325.00 0
2014-11-04 Multi-Stage Fracture 3245.20 3245.30 0
2014-11-04 Multi-Stage Fracture 3166.10 3166.20 0
2014-11-04 Multi-Stage Fracture 3089.30 3089.40 0
2014-11-04 Multi-Stage Fracture 3015.30 3015.40 0
2014-11-04 Multi-Stage Fracture 2931.50 2931.60 0
2014-11-04 Multi-Stage Fracture 2854.30 2854.40 0
2014-11-04 Multi-Stage Fracture 2774.10 2774.20 0
2014-11-04 Multi-Stage Fracture 2695.20 2695.30 0
2014-11-04 Multi-Stage Fracture 2611.70 2611.80 0
2014-11-04 Multi-Stage Fracture 3980.40 3980.50 0
2014-11-05 Multi-Stage Fracture 2530.50 2530.60 0
2014-11-05 Multi-Stage Fracture 2453.80 2453.90 0
2014-11-05 Multi-Stage Fracture 2374.10 2374.20 0
2014-11-05 Multi-Stage Fracture 2291.00 2291.10 0
2014-11-05 Multi-Stage Fracture 2211.40 2211.50 0
2014-11-05 Multi-Stage Fracture 2128.40 2128.50 0
2014-11-05 Multi-Stage Fracture 2049.30 2049.40 0
2014-11-05 Multi-Stage Fracture 1966.90 1967.00 0
2014-11-05 Multi-Stage Fracture 1886.90 1887.00 0
2014-11-04 Multi-Stage Fracture 3907.30 3907.40 0
2014-11-04 Multi-Stage Fracture 3812.20 3812.30 0
2014-11-04 Multi-Stage Fracture 3731.50 3731.60 0
2014-11-04 Multi-Stage Fracture 3647.40 3647.50 0
2014-11-04 Multi-Stage Fracture 3564.50 3564.60 0
2014-11-04 Multi-Stage Fracture 3485.00 3485.10 0
2014-11-04 Multi-Stage Fracture 3405.00 3405.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-04 2014-11-05 1,408 2,138 N/A
2 2014-11-04 2014-11-04 1,408 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 89.2079 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.4718 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0122 N/A
dibromoacetonitrile 3252-43-5 100 0.0122 N/A
non-hazardous ingredients Not Available 100 0.0122 N/A
polyethylene glycol 25322-68-3 100 0.0122 N/A
sodium bromide 7647-15-6 100 0.0122 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1922 N/A
water Not Available 100 0.1922 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0981 N/A
propylene glycol 57-55-6 100 0.0981 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0471 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0471 N/A
non-hazardous ingredients Not Available 100 0.0471 N/A
2 Sand 30/50 Trican silica crystalline 14808-60-7 100 7.6793 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.6822 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-04 2014-11-05 Surface Water - Runoff 2138

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 795 0.0 0.0 0.0
2015 8365 0.0 0.0 0.0
2016 8429 0.0 0.0 0.0
2017 8600 0.0 0.0 0.0
2018 7873 0.0 0.0 0.0
2019 7855 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-15 No Incident Encountered 0.00 0.00
2014-11-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References