X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495072216020

Well Details

Well ID: 0495072216020
Loading map...
Location: 02/16-22-049-07W5/0
Location Alias: 02/16-22-49-07 W5M
Location Alias 2: 02/16-22-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 22
County/Municipality: Drayton Valley
Well Name: EXORO ENERGY HZ PEMBINA 16-22-49-7
Operator Name: Gear Energy Ltd.
License Number: 0417681
License Date: 2010-01-21
License Status: Suspension
Spud Date: 2010-01-26
Final Drill Date: 2010-02-05
Well Total Depth: 2620.00 m
Surface Hole Latitude: 53.249471
Surface Hole Longitude: -114.949872

For data sources see[1][2]

Well History

Date Event
2010-01-21 Obtained License
2010-01-28 Surface Casing Operation Performed
2010-01-30 Direction Drilling Operation Performed - Horizontal
2010-02-01 Intermediate Casing Operation Performed
2010-02-05 Finished Drilling
2010-02-05 Perforation Treatment Performed - Open-Hole Completion
2010-02-05 Well Mode changed to Drilled and Cased
2010-02-06 Liner Casing Operation Performed
2010-02-08 Rig Released
2010-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2010-02-16 Well Log Performed
2010-04-05 Well Began Production
2010-04-05 Well Fluid changed to Crude Oil
2010-04-05 Well Mode changed to Pumping
2013-06-30 Well Fluid changed to Crude Oil
2013-06-30 Well Mode changed to Suspended
2013-07-11 Well Began Injection
2013-07-11 Well Fluid changed to Water
2013-07-11 Well Type changed to Injection
2015-07-01 Well Fluid changed to Water
2015-07-01 Well Mode changed to Suspended
2015-07-01 Well Type changed to Injection
2019-02-01 Well Fluid changed to Water
2019-02-01 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-30 1122.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-05 Open Hole/Barefoot Completion 2615.00 2620.00 0
2010-02-16 Multi-Stage Fracture 1784.50 1784.60 0
2010-02-16 Multi-Stage Fracture 1698.40 1698.50 0
2010-02-16 Multi-Stage Fracture 1597.80 1597.90 0
2010-02-16 Multi-Stage Fracture 2593.30 2593.50 0
2010-02-16 Multi-Stage Fracture 2486.60 2486.70 0
2010-02-16 Multi-Stage Fracture 2385.40 2385.50 0
2010-02-16 Multi-Stage Fracture 2300.20 2300.30 0
2010-02-16 Multi-Stage Fracture 2199.30 2199.40 0
2010-02-16 Multi-Stage Fracture 2097.90 2098.00 0
2010-02-16 Multi-Stage Fracture 1985.20 1985.30 0
2010-02-16 Multi-Stage Fracture 1885.80 1885.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6322 0.0 0.0 0.0
2011 7767 0.0 0.0 0.0
2012 4855 0.0 0.0 0.0
2013 3408 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References