X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495072616000

Well Details

Well ID: 0495072616000
Loading map...
Location: 00/16-26-049-07W5/0
Location Alias: 00/16-26-49-07 W5M
Location Alias 2: 00/16-26-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 26
County/Municipality: Brazeau County
Well Name: ARC ET AL DV 26 16-26-49-7
Operator Name: ARC Resources Ltd.
License Number: 0018284
License Date: 1959-12-10
License Status: Suspension
Spud Date: 1959-12-14
Final Drill Date: 1959-12-25
Well Total Depth: 1370.10 m
Surface Hole Latitude: 53.263354
Surface Hole Longitude: -114.906812

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-10 Obtained License
1959-12-25 Finished Drilling
1959-12-25 Well Mode changed to Drilled and Cased
1959-12-26 Production Casing Operation Performed
1960-01-06 Perforation Treatment Performed - Jet Perforation
1960-01-07 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-07 Perforation Treatment Performed - Fractured
1960-01-12 Well Began Production
1960-01-12 Well Fluid changed to Crude Oil
1960-01-12 Well Mode changed to Flowing
1961-07-20 Well Fluid changed to Crude Oil
1961-07-20 Well Mode changed to Pumping
1981-11-05 Well Fluid changed to Crude Oil
1981-11-05 Well Mode changed to Suspended
1987-02-23 Well Fluid changed to Crude Oil
1987-02-23 Well Mode changed to Pumping
1995-01-27 Perforation Treatment Performed - Jet Perforation
1995-01-27 Well Log Performed
2010-09-13 Perforation Treatment Performed - Fractured
2010-09-15 Perforation Treatment Performed - Chemical Squeeze
2014-02-21 Well Fluid changed to Crude Oil
2014-02-21 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-06 Perforation 1324.70 1328.90 7
1960-01-07 Acid Wash 1324.70 1328.90 0
1960-01-07 Fracture 1324.70 1328.90 0
1995-01-27 Perforation 1325.00 1328.80 7
2010-09-13 Fracture 1324.70 1328.80 0
2010-09-15 Chemical Squeeze 1324.70 1328.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5472 0.0 0.0 0.0
1968 8351 0.0 0.0 0.0
1969 7926 0.0 0.0 0.0
1970 7406 0.0 0.0 0.0
1971 7248 0.0 0.0 0.0
1972 7480 0.0 0.0 0.0
1973 8423 0.0 0.0 0.0
1974 8639 0.0 0.0 0.0
1975 8339 0.0 0.0 0.0
1976 8443 0.0 0.0 0.0
1977 8711 0.0 0.0 0.0
1978 8675 0.0 0.0 0.0
1979 8495 0.0 0.0 0.0
1980 8046 0.0 0.0 0.0
1981 7282 0.0 0.0 0.0
1987 7441 0.0 0.0 0.0
1988 8752 0.0 0.0 0.0
1989 8737 0.0 0.0 0.0
1990 8706 0.0 0.0 0.0
1991 8615 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8687 0.0 0.0 0.0
1995 8687 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 7982 0.0 0.0 0.0
1999 7931 0.0 0.0 0.0
2000 8591 0.0 0.0 0.0
2001 8707 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8368 0.0 0.0 0.0
2004 8704 0.0 0.0 0.0
2005 8717 0.0 0.0 0.0
2006 8591 0.0 0.0 0.0
2007 8350 0.0 0.0 0.0
2008 8780 0.0 0.0 0.0
2009 8721 0.0 0.0 0.0
2010 7123 0.0 0.0 0.0
2011 8119 0.0 0.0 0.0
2012 8122 0.0 0.0 0.0
2013 7165 0.0 0.0 0.0
2014 700 0.0 0.0 0.0

For data sources see[5]

References