If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495072812000 | |
Location: 00/12-28-049-07W5/0 | |
Location Alias: 00/12-28-49-07 W5M | |
Location Alias 2: 00/12-28-049-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 07 | |
Section: 28 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 12-28-49-7 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0423015 | |
License Date: 2010-08-27 | |
License Status: Issued | |
Spud Date: 2010-10-17 | |
Final Drill Date: 2010-10-24 | |
Well Total Depth: 2929.00 m | |
Surface Hole Latitude: 53.261677 | |
Surface Hole Longitude: -114.951209 |
Date | Event |
---|---|
2010-08-27 | Obtained License |
2010-10-17 | Surface Casing Operation Performed |
2010-10-18 | Well Log Performed |
2010-10-19 | Direction Drilling Operation Performed - Horizontal |
2010-10-21 | Intermediate Casing Operation Performed |
2010-10-24 | Finished Drilling |
2010-10-24 | Well Mode changed to Drilled and Cased |
2010-10-26 | Liner Casing Operation Performed |
2010-10-26 | Rig Released |
2010-11-23 | Well Log Performed |
2010-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-11-28 | Perforation Treatment Performed - Open-Hole Completion |
2010-11-30 | Well Began Production |
2010-11-30 | Well Fluid changed to Crude Oil |
2010-11-30 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-19 | 1010.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-27 | Multi-Stage Fracture | 1638.60 | 1756.60 | 0 |
2010-11-27 | Multi-Stage Fracture | 2879.60 | 2908.00 | 0 |
2010-11-28 | Open Hole/Barefoot Completion | 1638.60 | 2908.00 | 0 |
2010-11-27 | Multi-Stage Fracture | 1761.90 | 1902.80 | 0 |
2010-11-27 | Multi-Stage Fracture | 1907.90 | 2037.70 | 0 |
2010-11-27 | Multi-Stage Fracture | 2042.80 | 2171.30 | 0 |
2010-11-27 | Multi-Stage Fracture | 2176.40 | 2316.60 | 0 |
2010-11-27 | Multi-Stage Fracture | 2321.70 | 2461.10 | 0 |
2010-11-27 | Multi-Stage Fracture | 2466.30 | 2595.60 | 0 |
2010-11-27 | Multi-Stage Fracture | 2600.70 | 2740.30 | 0 |
2010-11-27 | Multi-Stage Fracture | 2745.40 | 2874.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 720 | 0.0 | 0.0 | 0.0 |
2011 | 8287 | 0.0 | 0.0 | 0.0 |
2012 | 8331 | 0.0 | 0.0 | 0.0 |
2013 | 8259 | 0.0 | 0.0 | 0.0 |
2014 | 8416 | 0.0 | 0.0 | 0.0 |
2015 | 8554 | 0.0 | 0.0 | 0.0 |
2016 | 7917 | 0.0 | 0.0 | 0.0 |
2017 | 7728 | 0.0 | 0.0 | 0.0 |
2018 | 7847 | 0.0 | 0.0 | 0.0 |
2019 | 7677 | 0.0 | 0.0 | 0.0 |
2020 | 2044 | 0.0 | 0.0 | 0.0 |
For data sources see[6]