If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495081216050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.218277,"lon":-115.028525,"icon":""}]} |
Location: 05/16-12-049-08W5/0 | |
Location Alias: 05/16-12-49-08 W5M | |
Location Alias 2: 05/16-12-049-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 08 | |
Section: 12 | |
County/Municipality: Brazeau County | |
Well Name: MOBIL ET AL NP12-16S PEM 16-12-49-8 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0013990 | |
License Date: 1957-09-13 | |
License Status: RecCertified | |
Spud Date: 1957-10-13 | |
Final Drill Date: 1957-10-24 | |
Well Total Depth: 1502.70 m | |
Surface Hole Latitude: 53.218277 | |
Surface Hole Longitude: -115.028525 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-09-13 | Obtained License |
1957-10-24 | Finished Drilling |
1957-10-24 | Well Mode changed to Drilled and Cased |
1957-10-25 | Production Casing Operation Performed |
1957-10-28 | Perforation Treatment Performed - Acid Wash - No Pressure |
1957-10-28 | Perforation Treatment Performed - Fractured |
1957-10-28 | Perforation Treatment Performed - Jet Perforation |
1957-11-03 | Well Began Production |
1957-11-03 | Well Fluid changed to Crude Oil |
1957-11-03 | Well Mode changed to Flowing |
1958-01-16 | Well Fluid changed to Crude Oil |
1958-01-16 | Well Mode changed to Pumping |
1958-11-30 | Well Type changed to Observation |
1990-12-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-12-05 | Plug Back Performed |
1990-12-05 | Well Abandoned |
1990-12-05 | Well Mode changed to Abandoned |
1990-12-05 | Well Type changed to Observation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-10-28 | Perforation | 1455.10 | 1459.40 | 13 |
1957-10-28 | Acid Wash | 1455.10 | 1459.40 | 0 |
1957-10-28 | Fracture | 1455.10 | 1459.40 | 0 |
1990-12-05 | Packing Device Capped w/Cement | 1415.00 | 1423.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]