X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495081414000

Well Details

Well ID: 0495081414000
Loading map...
Location: 00/14-14-049-08W5/0
Location Alias: 00/14-14-49-08 W5M
Location Alias 2: 00/14-14-049-08 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 08
Section: 14
County/Municipality: Brazeau County
Well Name: MOBIL PEMBINA 14-14-49-8
Operator Name: ARC Resources Ltd.
License Number: 0012652
License Date: 1956-11-14
License Status: Issued
Spud Date: 1956-11-15
Final Drill Date: 1956-11-25
Well Total Depth: 1510.30 m
Surface Hole Latitude: 53.234251
Surface Hole Longitude: -115.064956

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-11-14 Obtained License
1956-11-25 Finished Drilling
1956-11-25 Well Mode changed to Drilled and Cased
1956-11-26 Production Casing Operation Performed
1956-11-29 Perforation Treatment Performed - Fractured
1956-11-29 Perforation Treatment Performed - Jet Perforation
1956-12-28 Well Began Production
1956-12-28 Well Fluid changed to Crude Oil
1956-12-28 Well Mode changed to Flowing
1963-01-03 Well Fluid changed to Crude Oil
1963-01-03 Well Mode changed to Pumping
1972-06-28 Perforation Treatment Performed - Fractured
1975-07-03 Perforation Treatment Performed - Chemical Squeeze
1975-08-06 Perforation Treatment Performed - Chemical Squeeze
1975-08-28 Perforation Treatment Performed - Chemical Squeeze
1975-10-01 Perforation Treatment Performed - Chemical Squeeze
1976-07-23 Perforation Treatment Performed - Fractured
1986-09-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-11-29 Perforation 1475.80 1487.40 13
1956-11-29 Fracture 1475.80 1487.40 0
1972-06-28 Fracture 1475.80 1487.40 0
1975-07-03 Chemical Squeeze 1475.80 1487.40 0
1975-08-06 Chemical Squeeze 1475.80 1487.40 0
1975-08-28 Chemical Squeeze 1475.80 1487.40 0
1975-10-01 Chemical Squeeze 1475.80 1487.40 0
1976-07-23 Fracture 1475.80 1487.40 0
1986-09-16 Fracture 1475.80 1487.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 312 0.0 0.0 0.0
1968 5280 0.0 0.0 0.0
1969 2832 0.0 0.0 0.0
1970 7715 0.0 0.0 0.0
1971 8728 0.0 0.0 0.0
1972 8519 0.0 0.0 0.0
1973 8663 0.0 0.0 0.0
1974 8591 0.0 0.0 0.0
1975 7831 0.0 0.0 0.0
1976 8335 0.0 0.0 0.0
1977 8600 0.0 0.0 0.0
1978 8279 0.0 0.0 0.0
1979 8525 0.0 0.0 0.0
1980 7909 0.0 0.0 0.0
1981 8294 0.0 0.0 0.0
1982 8372 0.0 0.0 0.0
1983 8208 0.0 0.0 0.0
1984 8708 0.0 0.0 0.0
1985 8353 0.0 0.0 0.0
1986 8432 0.0 0.0 0.0
1987 8593 0.0 0.0 0.0
1988 8614 0.0 0.0 0.0
1989 8584 0.0 0.0 0.0
1990 8703 0.0 0.0 0.0
1991 8695 0.0 0.0 0.0
1992 8624 0.0 0.0 0.0
1993 8301 0.0 0.0 0.0
1994 8637 0.0 0.0 0.0
1995 8731 0.0 0.0 0.0
1996 8599 0.0 0.0 0.0
1997 8600 0.0 0.0 0.0
1998 8257 0.0 0.0 0.0
1999 8321 0.0 0.0 0.0
2000 8759 0.0 0.0 0.0
2001 8533 0.0 0.0 0.0
2002 8669 0.0 0.0 0.0
2003 8702 0.0 0.0 0.0
2004 8559 0.0 0.0 0.0
2005 7411 0.0 0.0 0.0
2006 7919 0.0 0.0 0.0
2007 8592 0.0 0.0 0.0
2008 8376 0.0 0.0 0.0
2009 8748 0.0 0.0 0.0
2010 8399 0.0 0.0 0.0
2011 8375 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 7620 0.0 0.0 0.0
2014 7710 0.0 0.0 0.0
2015 8360 0.0 0.0 0.0
2016 7836 0.0 0.0 0.0
2017 8481 0.0 0.0 0.0
2018 8449 0.0 0.0 0.0
2019 8559 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References