If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495091304020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.222492,"lon":-115.17049,"icon":""}]} |
| Location: 02/04-13-049-09W5/0 | |
| Location Alias: 02/04-13-49-09 W5M | |
| Location Alias 2: 02/04-13-049-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 13 | |
| County/Municipality: Brazeau County | |
| Well Name: INPLAY OIL HZ 102 PEMBINA 4-13-49-9 | |
| Operator Name: InPlay Oil Corp. | |
| License Number: 0481762 | |
| License Date: 2016-12-06 | |
| License Status: Issued | |
| Spud Date: 2017-01-02 | |
| Final Drill Date: 2017-01-09 | |
| Well Total Depth: 3188.00 m | |
| Surface Hole Latitude: 53.222492 | |
| Surface Hole Longitude: -115.170490 |
| Date | Event |
|---|---|
| 2016-12-06 | Obtained License |
| 2017-01-04 | Surface Casing Operation Performed |
| 2017-01-05 | Direction Drilling Operation Performed - Deviate |
| 2017-01-06 | Direction Drilling Operation Performed - Horizontal |
| 2017-01-09 | Finished Drilling |
| 2017-01-09 | Well Log Performed |
| 2017-01-09 | Well Mode changed to Drilled and Cased |
| 2017-01-10 | Production Casing Operation Performed |
| 2017-01-11 | Rig Released |
| 2017-06-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-06-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-07-19 | Well Began Production |
| 2017-07-19 | Well Fluid changed to Crude Oil |
| 2017-07-19 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-01-02 | Bonanza Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-01-05 | 1155.70 | Deviate (5 - 79 degrees) |
| 2017-01-06 | 1737.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-06-21 | Multi-Stage Fracture | 3163.20 | 3163.80 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2912.50 | 2913.20 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2876.90 | 2877.60 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2853.60 | 2854.30 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2818.00 | 2818.70 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2782.40 | 2783.00 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2758.40 | 2759.10 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2722.70 | 2723.30 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2686.90 | 2687.60 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2662.90 | 2663.50 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2627.20 | 2627.80 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3139.40 | 3140.00 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2591.40 | 2592.10 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2567.60 | 2568.20 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2531.90 | 2532.50 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2496.20 | 2496.80 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2472.20 | 2472.80 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2436.60 | 2437.20 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2400.90 | 2401.60 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2376.90 | 2377.50 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2341.30 | 2341.90 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2305.60 | 2306.20 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3115.30 | 3115.90 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2281.60 | 2282.30 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2245.90 | 2246.50 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2210.20 | 2210.90 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2186.20 | 2186.80 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2150.50 | 2151.10 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2114.80 | 2115.40 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2090.80 | 2091.50 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2055.10 | 2055.80 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 2019.40 | 2020.00 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 1983.50 | 1984.30 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3091.40 | 3092.00 | 0 |
| 2017-06-23 | Multi-Stage Fracture | 1959.60 | 1960.20 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1923.90 | 1924.50 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1899.80 | 1900.50 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1864.10 | 1864.80 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1840.10 | 1840.70 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1816.00 | 1816.70 | 0 |
| 2017-06-24 | Multi-Stage Fracture | 1789.90 | 1790.50 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3067.30 | 3067.90 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3043.10 | 3043.70 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 3007.40 | 3008.00 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2971.80 | 2972.50 | 0 |
| 2017-06-22 | Multi-Stage Fracture | 2947.80 | 2948.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-06-21 | 2017-06-24 | 1,539 | 4,126 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 85.6004 | N/A | |||
| Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 14.435 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 14.435 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 14.435 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 14.435 | N/A | ||||
| Chemcide PT | Canyon Technical Services | Bactericide/Biocide | Methyl Alcohol | 67-56-1 | 100 | 0.0111 | N/A | |
| N-Coco Alkyltrimethylenediamine diacetates | 61791-64-8 | 100 | 0.0111 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0947 | N/A | |
| Water | 7732-18-5 | 100 | 0.0947 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0829 | N/A | |
| nanoFLO 2 | Canyon Technical Services | Surfactant | Refer to MSDS | 1097 | 100 | 0.0894 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-06-21 | 2017-06-24 | Surface Water - Runoff | 4598 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 3960 | 0.0 | 0.0 | 0.0 |
| 2018 | 8683 | 0.0 | 0.0 | 0.0 |
| 2019 | 8747 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-01-11 | No Incident Encountered | 0.00 | 0.00 |
| 2017-06-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]