X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110106030

Well Details

Well ID: 0495110106030
Loading map...
Location: 03/06-01-049-11W5/0
Location Alias: 03/06-01-49-11 W5M
Location Alias 2: 03/06-01-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 01
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ 103 PEMBINA 6-1-49-11
Operator Name: Ridgeback Resources Inc.
License Number: 0484770
License Date: 2017-07-31
License Status: Issued
Spud Date: 2017-09-20
Final Drill Date: 2017-09-29
Well Total Depth: 4508.00 m
Surface Hole Latitude: 53.194805
Surface Hole Longitude: -115.517260

For data sources see[1][2]

Well History

Date Event
2017-07-31 Obtained License
2017-09-20 Surface Casing Operation Performed
2017-09-24 Direction Drilling Operation Performed - Deviate
2017-09-25 Direction Drilling Operation Performed - Horizontal
2017-09-29 Finished Drilling
2017-09-29 Well Log Performed
2017-09-29 Well Mode changed to Drilled and Cased
2017-09-30 Well Log Performed
2017-10-01 Production Casing Operation Performed
2017-10-01 Rig Released
2017-10-10 Well Log Performed
2017-10-12 Well Log Performed
2017-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-14 Well Began Production
2017-11-14 Well Fluid changed to Crude Oil
2017-11-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-20 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-24 1303.80 Deviate (5 - 79 degrees)
2017-09-25 2109.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-18 Multi-Stage Fracture 4478.00 4478.10 0
2017-10-18 Multi-Stage Fracture 3776.00 3776.10 0
2017-10-18 Multi-Stage Fracture 3698.00 3698.10 0
2017-10-18 Multi-Stage Fracture 3620.00 3620.10 0
2017-10-18 Multi-Stage Fracture 3542.00 3542.10 0
2017-10-18 Multi-Stage Fracture 3464.00 3464.10 0
2017-10-19 Multi-Stage Fracture 3386.00 3386.10 0
2017-10-19 Multi-Stage Fracture 3308.00 3308.10 0
2017-10-19 Multi-Stage Fracture 3230.00 3230.10 0
2017-10-19 Multi-Stage Fracture 3152.00 3152.10 0
2017-10-19 Multi-Stage Fracture 3074.00 3074.10 0
2017-10-18 Multi-Stage Fracture 4400.00 4400.10 0
2017-10-19 Multi-Stage Fracture 2996.00 2996.10 0
2017-10-19 Multi-Stage Fracture 2918.00 2918.10 0
2017-10-19 Multi-Stage Fracture 2840.00 2840.10 0
2017-10-19 Multi-Stage Fracture 2762.00 2762.10 0
2017-10-19 Multi-Stage Fracture 2684.00 2684.10 0
2017-10-19 Multi-Stage Fracture 2606.00 2606.10 0
2017-10-19 Multi-Stage Fracture 2222.00 2222.10 0
2017-10-19 Multi-Stage Fracture 2450.00 2450.10 0
2017-10-19 Multi-Stage Fracture 2372.00 2372.10 0
2017-10-19 Multi-Stage Fracture 2294.00 2294.10 0
2017-10-18 Multi-Stage Fracture 4322.00 4322.10 0
2017-10-19 Multi-Stage Fracture 2216.00 2216.10 0
2017-10-18 Multi-Stage Fracture 4244.00 4244.10 0
2017-10-18 Multi-Stage Fracture 4166.00 4166.10 0
2017-10-18 Multi-Stage Fracture 4088.00 4088.10 0
2017-10-18 Multi-Stage Fracture 4010.00 4010.10 0
2017-10-18 Multi-Stage Fracture 3932.00 3932.10 0
2017-10-18 Multi-Stage Fracture 3854.00 3854.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-18 2017-10-19 1,828 3,455 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.7724 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 6.2275 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0094 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0095 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.095 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.095 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0705 N/A
Tergitol 15-S-20 68131-40-8 100 0.0705 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0773 N/A
Methanol 67-56-1 100 0.0773 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0773 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-15 2017-10-16 Surface Water - Runoff 3677
2017-10-18 2017-10-19 Central Water Distribution Facility 30

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1143 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8755 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-02 No Incident Encountered 0.00 0.00
2017-11-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References