X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110308000

Well Details

Well ID: 0495110308000
Loading map...
Location: 00/08-03-049-11W5/0
Location Alias: 00/08-03-49-11 W5M
Location Alias 2: 00/08-03-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 03
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 8-3-49-11
Operator Name: Ridgeback Resources Inc.
License Number: 0095452
License Date: 1982-03-08
License Status: Suspension
Spud Date: 1982-03-12
Final Drill Date: 1982-03-22
Well Total Depth: 1865.00 m
Surface Hole Latitude: 53.196193
Surface Hole Longitude: -115.518774

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-03-08 Obtained License
1982-03-12 Lost Circulation Occurred
1982-03-22 Finished Drilling
1982-03-24 Production Casing Operation Performed
1982-03-24 Well Mode changed to Drilled and Cased
1982-06-08 Perforation Treatment Performed - Cement Squeeze
1982-06-08 Perforation Treatment Performed - Jet Perforation
1982-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-12 Perforation Treatment Performed - Fractured
1982-06-25 Well Began Production
1982-06-25 Well Fluid changed to Crude Oil
1982-06-25 Well Mode changed to Pumping
1984-08-16 Perforation Treatment Performed - Jet Perforation
1984-08-20 Perforation Treatment Performed - Cement Squeeze
1984-08-20 Plug Back Performed
1984-08-22 Perforation Treatment Performed - Acid Wash - No Pressure
1995-11-13 Perforation Treatment Performed - Jet Perforation
1995-11-16 Perforation Treatment Performed - Fractured
2015-09-01 Well Fluid changed to Crude Oil
2015-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-08 Perforation 1847.00 1848.00 10
1995-11-13 Perforation 1839.50 1841.00 13
1995-11-16 Fracture 1829.50 1841.00 0
1982-06-08 Cement Squeeze 1847.00 1848.00 0
1982-06-08 Perforation 1831.00 1833.00 10
1982-06-09 Acid Treatment 1831.00 1833.00 0
1982-06-12 Fracture 1831.00 1833.00 0
1984-08-16 Perforation 1468.00 1477.00 13
1984-08-20 Cement Squeeze 1468.00 1477.00 0
1984-08-22 Acid Wash 1831.00 1833.00 0
1995-11-13 Perforation 1829.50 1834.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 4051 0.0 0.0 0.0
1983 7775 0.0 0.0 0.0
1984 7616 0.0 0.0 0.0
1985 7829 0.0 0.0 0.0
1986 5852 0.0 0.0 0.0
1987 8283 0.0 0.0 0.0
1988 8471 0.0 0.0 0.0
1989 8657 0.0 0.0 0.0
1990 8279 0.0 0.0 0.0
1991 8447 0.0 0.0 0.0
1992 8447 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8591 0.0 0.0 0.0
1995 7649 0.0 0.0 0.0
1996 7239 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 7802 0.0 0.0 0.0
1999 8455 0.0 0.0 0.0
2000 8567 0.0 0.0 0.0
2001 8387 0.0 0.0 0.0
2002 8639 0.0 0.0 0.0
2003 8615 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 7169 0.0 0.0 0.0
2010 4752 0.0 0.0 0.0
2011 8711 0.0 0.0 0.0
2012 8519 0.0 0.0 0.0
2013 8255 0.0 0.0 0.0
2014 8660 0.0 0.0 0.0
2015 1464 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-03-12 Lost Circulation 24.00 24.00

For data sources see[6]

References