If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495110501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.195524,"lon":-115.588898,"icon":""}]} |
| Location: 00/01-05-049-11W5/0 | |
| Location Alias: 00/01-05-49-11 W5M | |
| Location Alias 2: 00/01-05-049-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 05 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 1-5-49-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0421962 | |
| License Date: 2010-07-20 | |
| License Status: Issued | |
| Spud Date: 2010-08-19 | |
| Final Drill Date: 2010-09-01 | |
| Well Total Depth: 3421.00 m | |
| Surface Hole Latitude: 53.195524 | |
| Surface Hole Longitude: -115.588898 |
| Date | Event |
|---|---|
| 2010-07-20 | Obtained License |
| 2010-08-21 | Surface Casing Operation Performed |
| 2010-08-22 | Well Log Performed |
| 2010-08-23 | Direction Drilling Operation Performed - Horizontal |
| 2010-08-25 | Well Log Performed |
| 2010-09-01 | Finished Drilling |
| 2010-09-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-09-01 | Well Log Performed |
| 2010-09-01 | Well Mode changed to Drilled and Cased |
| 2010-09-03 | Liner Casing Operation Performed |
| 2010-09-03 | Production Casing Operation Performed |
| 2010-09-04 | Rig Released |
| 2010-10-19 | Well Log Performed |
| 2010-10-21 | Well Began Production |
| 2010-10-21 | Well Fluid changed to Crude Oil |
| 2010-10-21 | Well Mode changed to Pumping |
| 2010-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-10-30 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-08-23 | 1465.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-09-01 | Open Hole/Barefoot Completion | 3413.50 | 3421.00 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2841.40 | 2841.50 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2771.80 | 2771.90 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2702.40 | 2702.50 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2632.90 | 2633.00 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2574.40 | 2574.50 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2504.70 | 2504.80 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2434.90 | 2435.00 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2363.90 | 2364.00 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2305.10 | 2305.20 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2235.30 | 2235.40 | 0 |
| 2010-10-28 | Multi-Stage Fracture | 3368.60 | 3368.70 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2164.70 | 2164.80 | 0 |
| 2010-10-30 | Multi-Stage Fracture | 2095.50 | 2095.60 | 0 |
| 2010-10-28 | Multi-Stage Fracture | 3310.80 | 3310.90 | 0 |
| 2010-10-28 | Multi-Stage Fracture | 3240.40 | 3240.50 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 3171.10 | 3171.20 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 3101.40 | 3101.50 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 3042.30 | 3042.40 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2971.60 | 2971.70 | 0 |
| 2010-10-29 | Multi-Stage Fracture | 2901.70 | 2901.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 792 | 0.0 | 0.0 | 0.0 |
| 2011 | 8042 | 0.0 | 0.0 | 0.0 |
| 2012 | 8690 | 0.0 | 0.0 | 0.0 |
| 2013 | 8384 | 0.0 | 0.0 | 0.0 |
| 2014 | 8602 | 0.0 | 0.0 | 0.0 |
| 2015 | 7067 | 0.0 | 0.0 | 0.0 |
| 2016 | 8247 | 0.0 | 0.0 | 0.0 |
| 2017 | 8717 | 0.0 | 0.0 | 0.0 |
| 2018 | 8541 | 0.0 | 0.0 | 0.0 |
| 2019 | 8053 | 0.0 | 0.0 | 0.0 |
| 2020 | 2108 | 0.0 | 0.0 | 0.0 |
For data sources see[6]