If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495110516020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.204201,"lon":-115.58883,"icon":""}]} |
| Location: 02/16-05-049-11W5/0 | |
| Location Alias: 02/16-05-49-11 W5M | |
| Location Alias 2: 02/16-05-049-11 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 11 | |
| Section: 05 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 16-5-49-11 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0425792 | |
| License Date: 2010-11-12 | |
| License Status: Issued | |
| Spud Date: 2010-12-04 | |
| Final Drill Date: 2010-12-18 | |
| Well Total Depth: 3373.00 m | |
| Surface Hole Latitude: 53.204201 | |
| Surface Hole Longitude: -115.588830 |
| Date | Event |
|---|---|
| 2010-11-12 | Obtained License |
| 2010-12-06 | Surface Casing Operation Performed |
| 2010-12-08 | Direction Drilling Operation Performed - Horizontal |
| 2010-12-18 | Finished Drilling |
| 2010-12-18 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-12-18 | Well Log Performed |
| 2010-12-18 | Well Mode changed to Drilled and Cased |
| 2010-12-21 | Liner Casing Operation Performed |
| 2010-12-21 | Production Casing Operation Performed |
| 2010-12-21 | Rig Released |
| 2011-01-09 | Well Log Performed |
| 2011-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-03 | Well Began Production |
| 2011-02-03 | Well Fluid changed to Crude Oil |
| 2011-02-03 | Well Mode changed to Flowing |
| 2014-04-23 | Well Fluid changed to Crude Oil |
| 2014-04-23 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-12-08 | 1405.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-18 | Open Hole/Barefoot Completion | 3363.00 | 3373.00 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2789.70 | 2789.80 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2728.80 | 2728.90 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2666.70 | 2666.80 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2593.90 | 2594.00 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2533.00 | 2533.10 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2460.50 | 2460.60 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2388.10 | 2388.20 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2326.70 | 2326.80 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2254.90 | 2255.00 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2193.80 | 2193.90 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 3340.50 | 3340.60 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2121.70 | 2121.80 | 0 |
| 2011-02-01 | Multi-Stage Fracture | 2060.40 | 2060.50 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 3262.10 | 3262.20 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 3200.60 | 3200.70 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 3128.00 | 3128.10 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 3067.30 | 3067.40 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2993.60 | 2993.70 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2932.90 | 2933.00 | 0 |
| 2011-01-31 | Multi-Stage Fracture | 2861.20 | 2861.30 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6453 | 0.0 | 0.0 | 0.0 |
| 2012 | 8602 | 0.0 | 0.0 | 0.0 |
| 2013 | 8486 | 0.0 | 0.0 | 0.0 |
| 2014 | 8518 | 0.0 | 0.0 | 0.0 |
| 2015 | 7567 | 0.0 | 0.0 | 0.0 |
| 2016 | 7911 | 0.0 | 0.0 | 0.0 |
| 2017 | 8684 | 0.0 | 0.0 | 0.0 |
| 2018 | 8518 | 0.0 | 0.0 | 0.0 |
| 2019 | 8376 | 0.0 | 0.0 | 0.0 |
| 2020 | 2131 | 0.0 | 0.0 | 0.0 |
For data sources see[6]